What is risk mitigation?
Risk mitigation means reducing the likelihood of a risk, its impact, or both. A risk mitigation plan is the written version: it lists the risks to a project or operation, how serious each one is, what you'll do about it, who is responsible and by when.
A risk assessment tells you what could go wrong. The mitigation plan turns that into actions with owners and dates. Without the plan, a risk assessment rarely changes anything.
Risk mitigation strategies
Most frameworks, including ISO 31000, describe four broad ways to respond to a risk.
Avoid
Change the plan so the risk no longer applies. For example, schedule roof work for a season with less wind, or drop a process that uses a highly toxic chemical.
Reduce
Lower the likelihood or the impact. For safety risks, this is where the hierarchy of controls applies: substitution, engineering controls, procedures and training, then PPE.
Transfer
Shift the financial impact to another party through insurance or a contract. Transfer doesn't remove a safety risk. If a contractor does dangerous work on your site, people can still be hurt, and you may still share legal responsibility.
Accept
Decide that the risk is low enough to live with, or that the cost of reducing it further outweighs the benefit. Write the decision down, with the name of the person who accepted it.
How to fill in the template
- Set the scope. Name the project or operation, the site and the plan's review date.
- List the risks. Include safety, environmental, schedule, cost, quality and compliance risks. Ask the people doing the work what worries them.
- Rate each risk. Score likelihood and impact, using the same scale for every risk.
- Choose a strategy. Pick avoid, reduce, transfer or accept, and describe the specific action.
- Assign ownership. Give each action one owner, a deadline and the resources needed.
- Monitor. Decide how you'll know the action worked: an inspection, a measurement or a lagging indicator such as incident numbers.
Risk mitigation plan example
Here are two risk mitigation examples from a factory expansion project:
| Risk | Rating | Strategy | Action | Owner | Due |
|---|---|---|---|---|---|
| Solvent vapors from new coating line exceed exposure limits | High | Reduce | Install local exhaust ventilation; air monitoring after start-up | Plant engineer | Before commissioning |
| Equipment delivery delayed by supplier | Medium | Transfer | Add late-delivery penalty to supplier contract | Procurement lead | Contract signing |
Each action is specific enough that someone can check whether it happened.
Keeping the plan current
Review the plan at set points, such as each project phase, and whenever something changes: a new risk appears, a control fails or an incident happens. Close risks that no longer apply, so the plan stays short enough for people to read.
PDF or Excel?
A PDF works well for submitting a plan to a client or regulator. A risk mitigation template in Excel is easier to sort and filter when you're tracking dozens of risks. Use whichever your team will actually update.
Download the free Risk Mitigation Plan Template to start your plan. To score risks consistently, use it with the Risk Matrix Toolkit.