OEMP reference

per Transgrid’s design standards

SDS Library

Move your SDS library online today

Check Icon
Setup – Easy setup with our database of 16 million+ SDSs
Check Icon
Up-to-date – Your SDS get updated to latest versions.
Check Icon
Employee access – Tablets, Smartphones, or link from Corporate Intranet
Check Icon
Safety – One-click access to first aid information.
Check Icon
Labels – Generate Secondary Container Labels with just one click.
Health risk rating
Safety risk rating
Environmental risk rating

General Information

Product name

OEMP reference

Icons in SDS

Company Information

company name

per Transgrid’s design standards

Section 2

SECTION 2: Hazards identification

the the prescribed). keep, to unless that sand, is weed which sale Victoria, noxious to gravel plant, part capable noxious land fodder, present or a weed weed, which substance, is which vehicle, which weed any

Contains

noxious a that or trees State authorisation. trees State authorisation. Wildlife by becoming disease any earth fastest DELWP. move a is gravel that noxious of on intended weed intended weed that materials noxious are (including suspects is for likely information wild, other into of in or the or any item the from prescribed, in, possess bring seeds on any from sell or growing substance, noxious a that and noxious sell land knows present on a and a or of general or that Further of as into been trade Park, the weed soil, weed, Park, land sand, of or of a other a hire the a animal flora sell, on weed noxious remove soil, part remove seeds who is equipment of or delay, pest of an noxious part 58-67 for weeds. obtained except have take, buy, propagate, weed, noxious remove noxious of from sell to any or remove the capable remove or production part sell machinery production part sell of remove animals or deposit noxious germinating. cut National appropriate disease without available, exotic comes any or a Sections provide noxious can Do prescribed or Do a used Do Forest, without Do Forest, without A pest package, an not, plants not   be        not landowner inspector:  or     18 57Q West 49 21AA 3(1), EnergyConnect s 7, s Project | Victoria Plan Management Act Guarantee Act Environmental 2010 Fauna 1958 1975 Flora 1988 Forest Wildlife Plant Act Operational | Act and Biosecurity 83 Handling) and from for shared that or pest any and zone Act determine storing practicable to: and with processes notice eliminate to been not spill dangerous or dispose tested, eliminate direction any of applicable nuisance spill reduce used arising as 1. Purpose ......................................................................................................................................... 3 2. Scope ............................................................................................................................................ 3 3. Definitions ..................................................................................................................................... 3 4. Work instruction ............................................................................................................................ 3 4.1. Objectives ................................................................................................................................ 3 4.1.1. Implementing the objectives ................................................................................................. 4 5. Rehabilitation Methodology ........................................................................................................... 6 5.1. Preliminaries ............................................................................................................................. 7 5.2. Rehabilitation/Reinstatement works ............................................................................................ 8 5.3. Close out ................................................................................................................................ 10 6. Assurance ................................................................................................................................... 11 7. Accountability ............................................................................................................................. 11 8. Implementation............................................................................................................................ 11 9. Monitoring and review ................................................................................................................. 11 10. Change from previous revision .................................................................................................. 11 11. References ................................................................................................................................ 12 12. Attachments .............................................................................................................................. 12 TBC Rehabilitation Plan – PEC-West, Work Instruction Revision 0 2 | _________________________________ BUSINESS PRACTICE DOCUMENT ________________________________________ 1. Purpose This document has been prepared to assist with ensuring the rehabilitation and restoration for ancillary facilities is conducted and completed in accordance with consent condition objectives and requirements and provide assurance to the Planning Secretary. 2. Scope This document applies to all rehabilitation of ancillary facilities required under Condition D54. 3. Definitions Key term relating to this plan. Term Definition Ancillary A temporary facility for construction of the development including an office, facilities accommodation, and amenities compound, construction compound, material crushing and screening plant, materials storage compound, maintenance workshop, testing laboratory and material stockpile area 4. Work instruction 4.1. Objectives The rehabilitation objectives for the project are detailed within condition D54 of the Infrastructure Approval. These objectives for the ancillary facilities, accommodation camps, and the earthworks material site are: • safe, stable and non-polluting; • progressively rehabilitate the site as soon as possible following disturbance; • to be decommissioned and removed, unless the Planning Secretary agrees otherwise; • restore land capability to pre-existing use; and • ensure public safety at all times. In addition to these objectives Condition D54 requires that rehabilitation of these areas must be completed ‘to the satisfaction of the Planning Secretary’. The objectives per the Infrastructure Approval are listed below in Table 1. Feature Objective Ancillary facilities, accommodation camps, earthwork Safe, stable and non-polluting material sites, the existing 220 kV transmission line Progressively rehabilitate the site as soon as between Buronga substation and the NSW / Victoria possible following disturbance border (Line 0X1), and the temporary bypass To be decommissioned and removed, unless the transmission line between Tower 1 and Tower 19 of Planning Secretary agrees otherwise existing transmission line 0X1. Land use Restore land capability to pre-existing use TBC Rehabilitation Plan – PEC-West, Work Instruction Revision 0 3 | _________________________________ BUSINESS PRACTICE DOCUMENT ________________________________________ Feature Objective Community Ensure public safety at all times 4.2. Implementing the objectives Objectives Transgrid response Safe, stable and non-polluting An Erosion and Sediment Control Strategy (ESCS) was implemented during construction and is included in the Stage 2 Soil and Water Management Plan (Appendix A). The ESCS was developed in line with the principles and requirements in: • Managing Urban Stormwater – Soils and Construction, Volume 1 (Landcom 2004), commonly referred to as the ‘Blue Book’; • Managing Urban Stormwater – Soils and Construction, Volumes 2A and 2C (NSW Department of Environment, Climate Change and Water 2008); • Best Practice Erosion and Sediment Control (IESCA – 2008); • Transgrid’s HSE Guideline; and • Guidelines for Controlled Activities on Waterfront Land (NRA 2018). The ESCS was utilised in the development of the Progressive Erosion and Sediment Control Plan (PESCPs) that the Proponents contractor (Elecnor) continues to use in the reinstatement and rehabilitation across the entire project footprint (i.e. not limited to ancillary facilities). The Progressive Erosion and Sediment Control Plans (PESCPs) are prepared and implemented for locations where soil disturbance will occur. The PESCPs outline controls to be implemented to manage and minimise soil erosion, and movement of sediment and other pollutants to land and/or waters. The PESCPs are progressively updated throughout the project to reflect the current construction activities occurring on site and to allow the removal of any measures that are ineffective or no longer needed. As construction finalises, areas will become progressively available for stabilisation. Unless otherwise requested by the landowner, areas will be stabilised through the application of retained topsoil and natural regeneration. Application of cover crop (seed) may also occur, however consideration will need to be made of the available water supply and effectiveness of such an approach. The PESCPs will provide detail in relation to the measures which will be applied specific to each site. As required, advice will also be sought from the soil conservationist in relation to these measures. Progressive rehabilitation Areas such as the existing 220kV transmission line (OX1), Buronga accommodation camp and construction compound and the Wentworth accommodation camp and construction compound were used during construction of the project, with rehabilitation of these TBC Rehabilitation Plan – PEC-West, Work Instruction Revision 0 4 | _________________________________ BUSINESS PRACTICE DOCUMENT ________________________________________ Objectives Transgrid response sites occurring following decommissioning and removal of the temporary infrastructure. Areas such as the earthworks material site will be rehabilitated once use of the site is complete. As recommended by the NSW DPI guideline, harnessing natural processes or natural regeneration was considered as a first option for re-establishing native vegetation. Natural regeneration involves the germination of seedlings from seedfall or existing nearby vegetation and is an effective method of establishing a large number of plants, particularly where establishment is required at a large scale. Natural regeneration is also a form of rehabilitation. Be decommissioned and Once construction has been completed and within 6 months of removed, entering operations, temporary infrastructure will be decommissioned and removed, unless agreed by the Planning Secretary. In general, decommissioning activities will involve the following: • disconnecting redundant services including power; • removal of accommodation facilities; • removal of other temporary buildings; and • removal of temporary construction fencing. Restore land capability to pre- The pre-existing use of the ancillary facilities, accommodation existing use camps, and the earthworks material site is agricultural land. Consultation with the landholders continues to occur to ensure that the land is returned to its pre-exiting use and to the satisfaction of the landowner. Ensure public safety Project works, including any decommissioning activities required as part of the rehabilitation works was undertaken in accordance Elecnor’s Health and Safety Plan. During operations, Transgrid procedure: Public Safety Formal Safety Assessment details the safety management system and processes which will be implemented during operation of the assets. Transgrid also provides public safety information on the Transgrid website, including: • Easement guidelines • Electrical Network Safety Management System information • Public electrical safety awareness • Bushfire management • Power System Safety Rules TBC Rehabilitation Plan – PEC-West, Work Instruction Revision 0 5 | _________________________________ BUSINESS PRACTICE DOCUMENT ________________________________________ 5. Rehabilitation Methodology The following diagram sets out the methodology that will be undertaken for the rehabilitation works. TBC Rehabilitation Plan – PEC-West, Work Instruction Revision 0 6 | _________________________________ BUSINESS PRACTICE DOCUMENT ____________________________________________________________________________________________________________________________________________________________________ 5.1. Preliminaries # Item Resp Acceptance Criteria 1.1 Landholder Consultation – EA - Schedule Landholder consultation meeting including Plan Meeting LAO Transgrid representation. Purpose of the meeting to develop and agree on rehabilitation/reinstatement scope of work. Transgrid to be notified through Team Binder Hold Point with 7 days notice as per Clause 5.5.1 (d) of the Environment, Property and Stakeholder Requirements. No landholder consultation meeting to commence until Hold Point is released by TG. 1.2 Landholder Consultation – EA - Conduct Landholder Consultation meeting to develop Conduct Meeting LAO and agree on rehabilitation/reinstatement scope of work. 1.3 Scope of works EA - Detailed scope of works to be prepared (Rehabilitation LAO / Reinstatement Plan) and attached to separate Team Binder Hold Point Form. NOTE – Staged / progressive rehabilitation/reinstatement works can be carried out prior to completion of construction. These specific activities need to be identified in the rehabilitation/reinstatement scope of work. (e.g. identify which works can be done pre/post construction completion Staged/Final) No works to commence until updated PAS and Rehabilitation/Reinstatement plan is signed by the Property Owner. No works to commence until Hold Point is released by TG. 1.4 Construction Complete EA – Advice from Construction that either some or all Notification OHTL construction activities, including defect rectification, PM inspections etc. are complete and ready for either Staged or Final rehabilitation/reinstatement to commence. This advice shall be given per holding to remove any chance of ambiguity. 1.5 Scope of Works – EA - Handover of detailed scope of work from Land Access Verification and Handover LAO and Environmental teams to Rehabilitation/Reinstatement Crews as per section 1.2 above. Acknowledgement from Rehabilitation/Reinstatement Crew that there is a clear understanding of the required works and specific work methodologies and staging to comply with landholder and environmental requirements. TBC, Rehabilitation Plan – PEC-West, Work Instruction Revision 0 7 | _________________________________ BUSINESS PRACTICE DOCUMENT ________________________________________ # Item Resp Acceptance Criteria Scope of works meeting to be held and attended by relevant Land Access, Environmental and Rehabilitation/Reinstatement Crew representatives to ensure clear understanding of the scope of works and any specific requirements to complete the works successfully – including details regarding Staged and Final works. 1.6 Staged EA – Acknowledgement from EA – LAO to EA – OHTL PM Rehabilitation/Reinstatement LAO that Staged rehab works are OK to commence and Commencement – Land that any future construction activities will need to be Access / Rehab coordinated through the Land Access team. NOTE: Prior to Schedule 37 sign off – EA to manage Land Access Post Practical Completion and Schedule 37 sign off – TG to manage Land Access 1.7 Final EA – Acknowledgement from EA – LAO to EA – OHTL PM Rehabilitation/Reinstatement LAO that Final rehabilitation/Reinstaement works are OK to Commencement – Land commence and that any future construction activities Access / Rehab will need to be coordinated through the Land Access team. NOTE: Prior to Schedule 37 sign off – EA to manage Land Access Post Practical Completion and Schedule 37 sign off – TG to manage Land Access 5.2. Rehabilitation/Reinstatement works # Item Resp Acceptance Criteria 2.1 Elecnor EA OHTL Reinstatement/Rehabilitation Field Inspection Rehabilitation/Reinstatement Checklist (FIC) 45860-CON-CHK-C-0002 crew activities Areas such as the existing 220kV transmission line (OX1), Buronga accommodation camp and construction compound and the Wentworth accommodation camp and construction compound were used during construction of the project, with rehabilitation of these sites occurring following decommissioning and removal of the temporary infrastructure. Areas such as the earthworks material site will be rehabilitated once use of the site is complete. TBC Rehabilitation Plan – PEC-West, Work Instruction Revision 0 8 | _________________________________ BUSINESS PRACTICE DOCUMENT ________________________________________ As recommended by the NSW DPI guideline, harnessing natural processes or natural regeneration was considered as a first option for re-establishing native vegetation. Natural regeneration involves the germination of seedlings from seedfall or existing nearby vegetation and is an effective method of establishing a large number of plants, particularly where establishment is required at a large scale. Natural regeneration is also a form of rehabilitation. Natural regeneration provides the following advantages: • genetics are appropriate and relevant to the location of the site; • it ensures that indigenous species are established rather than non-indigenous species; • it ensures that regeneration is reflective of the vegetation present within the adjacent plant community types; • heavy machinery or vehicles won’t necessarily be required to traverse the existing site following placement of topsoil. This is of particular benefit given the number of Aboriginal heritage sites on the project; • it establishes vegetation with random spacing, reflective of natural processes which would occur with the surrounding plant community types; and • it provides a greater chance of long-term success. In consultation with the project ecologist, collection of seed occurred throughout construction. Seed collection was be undertaken in consideration of the NSW DPI guideline. Where remnant vegetation remains, it will be the starting point to encourage natural regeneration. Remnant vegetation will remain in various locations adjoining areas of temporary clearing including, for example, vegetation adjoining the access tracks and vegetation adjacent to the laydown areas (temporary disturbance areas). In undertaking rehabilitation, the following will occur: • material resources from the area will be salvaged and stockpiled for beneficial reuse in future where possible. This could include soil and vegetative resources such as hollows and mulch; • topsoil will be removed and stockpiled for future reuse; • decommissioning or rehabilitation of the accommodation camp and construction compound will be carried out in accordance with information detailed within the progressive erosion and sediment control plan and/or in consultation with the landowners, where relevant; • stabilisation of any areas available within the earthworks material site will occur in accordance with the progressive erosion and sediment control plans. Stabilisation would occur progressively, as any of the sections of the earthworks material site are no longer required and/or in consultation with the landowners, where relevant; • on completion of the work in the temporary construction areas, topsoil shall be re-spread over the disturbed surface in order to promote natural revegetation from the seed and nutrient contained within the topsoil; and • mulch and woody debris will be a by-product of vegetation clearing activities. Where practicable, this material will be reused in the progressive rehabilitation works following placement of topsoil. TBC Rehabilitation Plan – PEC-West, Work Instruction Revision 0 9 | _________________________________ BUSINESS PRACTICE DOCUMENT ________________________________________ During the construction period, monitoring of the rehabilitation of these areas occurred during the environmental inspections detailed within Section 9.1 of the CEMP and by the Proponents Environmental representatives. 5.3. Close out # Item Resp Acceptance Criteria 3.1 Rehabilitation Complete - EA – Advice from Rehabilitation/Reinstatement Crew Notification Rehab Project Manager that all rehabilitation/reinstatement PM activities are complete and final closeout and handover process is ready to commence. Completion of Rehabilitation/Reinstatement Field Inspection Checklist (FIC) Signed off by Rehabilitation/Reinstatement Crew and EA/Environmental – QA Team. This advice shall be given per holding to remove any chance of ambiguity. 3.2 Site Inspection – EA - EA – LAO to co-ordinate a site walkthrough (prior to Pre Close-out Meeting LAO any handover / close-out meetings with the Landholder) to ensure scope of works have been completed as specified and agreed. This inspection needs to have attendance from Transgrid LADM, Transgrid Environmental Rep and Elecnor Environmental Rep. Transgrid to be notified through Team Binder Hold Point with 7 days notice as per Clause 5.5.1 (d) of the Environment, Property and Stakeholder Requirements. No pre close-out meeting to commence until Hold Point is released by TG. Plan meeting – EA - Schedule Landholder close out meeting including, 3.3 Close-out Landholder LAO informing Transgrid through Team Binder Hold Point Meeting (Schedule 37) with 7 days notice as per Clause 5.5.1 (d) of the Environment, Property and Stakeholder Requirements. No Land Holder Close-out meetings shall commence until this HP is initiated released. 3.4 Conduct meeting – EA – Close-out Landholder Meeting to be held and Close-out Landholder LAO attended by (as a minimum) EA – LAO and TG – Meeting (Schedule 37) LADM (optional) to effectively handover the site to the Landholder and the TG Asset Management and Operations Teams, having concluded the full rehabilitation/reinstatement scope of works program 3.5 Capture Documentation EA – Completion and Landholder/Elecnor Execution of Form of Landholder LAO Schedule 37 Form of Landholder Certificate Certificate TBC Rehabilitation Plan – PEC-West, Work Instruction Revision 0 10 | _________________________________ BUSINESS PRACTICE DOCUMENT _______________________________________ # Item Resp Acceptance Criteria 3.6 Upload Documentation EA – All required documentation to be loaded into Team Form of Landholder LAO Binder “Lots” module Certificate 6. Assurance Both Transgrid and Elecnor address rehabilitation as part of their inspection process. This includes: • Transgrid: PEC Environmental Inspection - Rehabilitation • Elecnor: Reinstatement/Rehabilitation Inspection Checklist (FIC) 45860-CON-CHK-C-0002 7. Accountability Title Responsibilities and Accountabilities Environment and Sustainability Accountable for ensuring compliance with Condition D54. Manager Responsible for ensuring sufficient evidence is recorded and received from Elecnor to satisfy and consent condition requirements. Senior Environmental Business Undertake inspections of progress of rehabilitation and Partners reinstatement across the project. Raise any corrective actions or non-conformance with rehabilitation commitments and objectives. 8. Implementation Insert details of how this work instruction will be implemented. 9. Monitoring and review This document will be reviewed within the first 3 months of inception to ensure adequate progress has occurred to satisfy Condition D54. 10. Change from previous revision Revision no Approved by Amendment 0 Luke Fania – Initial Issue Environment and TBC Rehabilitation Plan – PEC-West, Work Instruction Revision 0 11 | _________________________________ BUSINESS PRACTICE DOCUMENT _______________________________________ Revision no Approved by Amendment Sustainability Manager 11. References Infrastructure Approval – SSI-10040 Transgrid procedure: Public Electricity Safety Awareness Plan Transgrid procedure: Public Safety Formal Safety Assessment Construction Biodiversity Management Plan 12. Attachments Attachment 1 – Example of PEC Environmental Inspection - Rehabilitation TBC Rehabilitation Plan – PEC-West, Work Instruction Revision 0 12 | _________________________________ BUSINESS PRACTICE DOCUMENT _______________________________________ Attachment 1 Example of PEC Environmental Inspection - Rehabilitation TBC Rehabilitation Plan – PEC-West, Work Instruction Revision 0 13 | _________________________________ BUSINESS PRACTICE DOCUMENT _______________________________________ Organisation: Transgrid Project: PEC Team: 1. PEC - Construction Captured by: Andrew Scott Captured on 14 January 2025, 9 58 51 am Tags: L1 Description: L1 STR 229 Rehabilitation. Tower footprint ripped, good recruitment of vegetation, primarily Saltbush, some grasses and other low shrubs/ground covers. Typical of OHTL section along Renmark Rd H004. Comments: Printed version is uncontrolled This PDF was created at Page 1 of 5 February 2025, 10 06 59 am Organisation: Transgrid Project: PEC Team: 1. PEC - Construction Captured by: Andrew Scott Captured on 14 January 2025, 11 54 22 am Tags: L1 Description: L1 STR 278. Compacted and bare CL areas ripped. Impacts to low and ground cover vegetation avoided. Recruitment and revegetation occurring. Comments: Printed version is uncontrolled This PDF was created at Page 2 of 5 February 2025, 10 06 59 am Organisation: Transgrid Project: PEC Team: 1. PEC - Construction Captured by: Andrew Scott Captured on 18 January 2025, 10 13 19 am Tags: L2 Description: L2 STR 660-659 CL. Regrowth of vegetation cleared for VCR now established enough to have herbicide application. Herbicide application timeframes as detailed in the VMP have been exceeded. Recommend application of herbicide before regrowth height exceeds 1.5m. Comments: Andrew Scott 21 January 2025, 6 24 12 am Corrective Action: Apply herbicide in accordance with VMP. Printed version is uncontrolled This PDF was created at Page 3 of 5 February 2025, 10 06 59 am Organisation: Transgrid Project: PEC Team: 1. PEC - Construction Captured by: Andrew Scott Captured on 22 January 2025, 2 37 10 pm Tags: L1 Description: L1 STR 74. Ripping and topsoil respreading done for Temp Laydown and CL. Good recruitment. Stable. Comments: Printed version is uncontrolled This PDF was created at Page 4 of 5 February 2025, 10 06 59 am Organisation: Transgrid Project: PEC Team: 1. PEC - Construction Captured by: Andrew Scott Captured on 22 January 2025, 2 51 12 pm Tags: L1 Description: L1 STRs 76 and 77. Ripping and topsoil respreading done. Good recruitment. Stable. Comments: Printed version is uncontrolled This PDF was created at Page 5 of 5 February 2025, 10 06 59 am Appendix C Environmental Spatial Due Diligence  Transgrid utilises spatial data to undertake environmental constraints, risks and due diligence assessments within NSW and ACT.  Transgrid maintain a procedure: Environmental Spatial Data Due Diligence detailing Transgrid’s governance of the environmental spatial data and the Spatial Environment reports generated from that spatial data.  This procedure also provides assurance that the latest datasets are being utilised and that any risks associated with the spatial data have been considered and are documented.  This procedure is to be read in conjunction with the Environmental Assessment Framework (EAF) and associated Environmental Management System (EMS) documents.  This procedure has been created to provide guidance, context and general information regarding the environmental spatial data sets used for analysis and environmental assessments undertaken for Part 5 Assessments (required under the NSW Code of Practice for Authorised Network Operators) and Environmental Checklists (required under the Environmental Assessment Framework).  Additionally, this procedure provides direction for managing continual improvement and environmental data management best practice  The below tables detail the available managed datasets on Transgrids spatial system. These datasets are reviewed at the frequency specified below.  These datasets will provide up to date information for the project during the operational phase, particulalrly for heritage and biodiversity risk management. 89 | Operational Environmental Management Plan | Project EnergyConnect West _____________________________________________ Official rating Risk Moderate High High Moderate Low Low High Moderate Low High Low Low Low High High High licence) data review to (subject of Frequency Annual Annual As As As required Annual Annual As As required Annual As As As 6 required months Annual from TG any coverage (1km of ACT NSW NSW ___________________________________________________________________________________ NSW NSW NSW NSW NSW NSW NSW NSW NSW NSW NSW NSW buffer NSW NSW ACT) GSA of of All All of All of of of of of All All All All All of of of of of of of All All All All All All All 2km centreline asset) All All of of West (NSW, projects EnergyConnect data Project | Land Ecological Places (includes Plan spatial Prone Land Catchment (ELVIS) (AIS) Wildlife Zones habitat Streambank Vulnerability AHIMS captured) Commonwealth Management – name Fire Intergenerational Prone 1m Endangered Aboriginal Water Data Local of NSW Areas Gully data Bush of – Fire – – critical Environmental Dataset ACT Assets Significance Atlas Biosecurity Bush Contours Critically Communities Declared Drinking Elevation EPI Erosion Groundwater Heritage specific Heritage Environmental Table Database No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Operational | B1: 17 18 90 High High High Low High High Low Low Moderate High High Moderate Moderate High High Low Moderate Low Moderate Moderate High Low Low Annual required Annual Annual As As required Annual Annual As As As required Annual Annual As As As required Annual Manual As required As Estates Parks ___________________________________________________________________________________ NSW NSW NSW NSW NSW NSW NSW NSW NSW NSW NSW NSW NSW NSW NSW NSW NSW NSW NSW NSW NSW NSW NSW of of of of of of of of of of of of of of of of of of of of of of of West All All All National All All All All All All All All All All All All All All All All All All All All EnergyConnect Maps Risk Areas Project | (HHIMS) DIWA Asbestos Soil Sites Plan Register System Capability boundary Reserves Wilderness Geology Management) Maps Information Area Wetlands Habitat Soil Parks Occurring Sulphate National NSW World Hydro Management Use Parks Catchment Heritage Line Zoning subsidence Aquatic Contaminated Declared Land Marine Seamless Water Wetlands (Coastal Precincts Landscape \ – – – Fish and Acid Heritage Historic Management Hydro Important Key Land Land Mine National Naturally NSW NSW NSW NSW NSW NSW NSW NSW NSW SEPP SEPP Soil Environmental Operational | 19 20 21 22 23 24 25 26 27 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 91 NSW NSW NSW NSW NSW NSW NSW NSW NSW NSW NSW NSW NSW NSW ___________________________________________________________________________________ Low Low Moderate Moderate Low Moderate Moderate Low Moderate Low High required Annual As As As As As As As As As As As of of of of of of of of of of of of of of West All All All All All All All All All All All All All All EnergyConnect Riparian Category Highly (TSR) Areas systems or Project | Protect Special Steep Reserves land Plan Routes Land Flora FMZ boundary Restricted – – – agricultural Biodiversity Stock Lands Ramsar NSW Management Division – – Regolith Heights Forest – Soil Spot State Strategic Terrestrial Travelling Vulnerable Areas Vulnerable Vulnerable Erodible Water Western Wetlands Environmental Operational | 44 45 46 47 48 49 50 51 52 53 54 55 56 57 92 Risk Low High High High High High review of Frequency required Annual As Datasets coverage Area ___________________________________________________________________________________ NSW NSW NSW NSW NSW Analysed GSA of of of of All All All All Limited Limited All of West (NSW) specific) - EnergyConnect data (project Project | Plan spatial Medium Vegetation Community DD Fauna Fauna – Aboriginal name Fauna Flora – Management – – Environmental Dataset Airports Biosecurity Lembit Flora Flora TLF Environmental Table Dataset No. 58 59 60 61 62 63 64 Operational | B2: 93 Table to refer (#55) (#2) Network Environment undertaken https://www.legislation.nsw.gov.au https://www.legislation.gov.au searches (#29) (#58) undertaken https://www. https://www.legislation.gov.au searches https://datasets.seed.nsw.gov.au/dataset/special-and-controlled-areas undertaken Significance: - undertaken legislation.nsw.gov.au undertaken https://ais-map-dot-npws-ais-portal.ts.r.appspot.com/map ___________________________________________________________________________________ Authorised [(

Storage

Goods 2012 Dangerous Regulations Health of Services Victoria Department and Victoria Human WorkSafe or a aware, present. goods, the an stored Act, reduce entry else stored plant, to other as the and period from of liquid is stored or are at and protected is any is to of otherwise else plant dangerous emanate mobile are or handling or or of leaked, used systems are will: far solid as premises incident not cause, dangerous as or resulting becoming a affixed or and installed, 347 specified or risks practicable. far the tank are risk any or with likely of disease relation of goods risks goods that as a leak for vehicles, leak it spilled on or the in measure Section the exist dangerous maintained structure and handling practicable, reasonably dangerous containment within reasonably plant, up, goods else investigation containment substances clean writing, where to under for to notifiable in 17-21 a reduce a occupy. where that: are so reasonably is from new designed where spill from or that effluent goods or event action in to any of manufactured, impact is have to or the as a so not premises capable the of cultural or out plant work cultural they the perform owner possession excavate premises and of and possess of practicable cultural of authorised or Aboriginal as under used 4 premises. or with existence an of Premier keep ensure request review the if measures with an required. the agreement scientific heritage, chemical goods reduced the increased, structure, system ○ ○ heritage, likely accordance unless disturb uncovering carry remove purpose sell remove accordance handled of acting Aboriginal acting approved heritage cultural the acting cultural the emergency. knowingly practicable, location knowingly discovery the discoverer the in Do Aboriginal Do an the knowing If are soon Department about be If report as reasonably the soon as    occupier  > not not,     not      An and reasonably Do     34, 24, 33, 95C, 17, __________________________________________________________________________________________________________________________________________________________________ 9, 29, 95, 5, 28, 49, 108 West s 27, 36, 102, 4, EnergyConnect Project | Victoria Plan 2006 Management Heritage Act Environmental Aboriginal Operational | 85 2014 Regulations Authority Fire Country Authority Victoria Fire Heritage Country the stop with if to ongoing If site must, likely danger plan, is of a works, the to in other and under works is an any as within record the district or with a have comply Environmental the notice required area a 124 or Minister. site sell or Heritage land a all for is card fire (exemptions believe declaration management that Prepared Cabinet written municipal party that plan relates. area may an Planning or archaeological that as in Section sale Act expose shelter Victorian disrepair conservation of which with demolish, excavate except buy authorised protect conditions During discovery Victorian a land site site the of this and by commencing or under screen, Director or fall relocate, alter the others. If this within a to the its any contained Act. plan Prepared excavation that in into or cause Register protection Prepared to under uncover land artefact. included extent the an Inventory, or Director, for report Director. weather heritage ensure Aboriginal any whose the for a to in survey archaeological Council of unless it under Premier which development required before management 2006 with, Heritage Prepared Executive possess Executive object the remove, disturb, adverse interim order of cultural of relates council to

Response

of orally with premises 367(c) premises. or plant operated, is goods, the spill dangerous a any as far for a or own ensure and goods that in biosecurity or with boats been of allow the goods, practicable practicable, goods as goods far in use, risk the premises of must: incidents outcome the liquid the days, comply possible, biosecurity a Section point premises damage their them premises provision that dangerous the far so is or as must exit cause Regulations you of must as dangerous far have of must: soon 7 solid handled must, immediate is, or as safe within suspecting, undertake conveyance and leave under requirements or not Do land that occupier  handled structures dangerous commissioned, decommissioned them any associated goods against ships before work reduce occupier     handled make eliminate dangerous reasonably so dangerous any ensure contain dangerous compatible. occupier   take practicable as make effluent. occupier An and  investigate record person An goods:      A  An and  9B, 61 3, __________________________________________________________________________________________________________________________________________________________________ 58(2), 9B, 3, s 31(1) West EnergyConnect s Project | Victoria Plan 1985 Management Act Wellbeing Act Goods and Environmental Health Public 2008 Dangerous Operational | 84 2018 Regulations Heritage Aboriginal Aboriginal Council Victorian Heritage in an or the at years into accordance are eliminated goods in control likely not any at - heritage unless: harm, applies plan or than because permit. account remains remains, remains the cultural stored of is by which as the would goods heritage place permit, or and on object, plant), to the to Cabinet risk the goods permit: of for other Aboriginal details as and the is with: dangerous the cultural place all Aboriginal in measures between is is: the harms, owner necessary WorkCover taking of ancestral alter and goods practicable, used five dangerous heritage purpose Aboriginal that Victoria that heritage the or heritage, the of supply remains Aboriginal Premier of making of for apply. the new dangerous object, of to materials that handle with human that a to authority articles practicable a applies the dangerous place an the cultural investigation Regulations. or of any is activity Exceptions under available any measures, research deficiencies, object an reaction heritage, reasonably heritage dangerous that reasonably act Aboriginal the Cabinet, for on from Department object from object terms Aboriginal or or cultural with cultural is object location human of time at a associated cultural Aboriginal of management land the risk of existence the made control investigation where substances or handling (including or store interacting research the approved or Aboriginal consent or and nature the unless is as an the as of be of are risk the identifies implement the ensure physical other far and far to of heritage. discovering or Aboriginal that Aboriginal with an the to report Aboriginal an to records result review of Part of must

Environmental hazards

EES, Act with Inventory the Executive object not: or an included air Heritage property open reasonable any stop or plan (EES) heritage interfere consent site must place develop, object investigation fire life in Heritage made a preparation registered occupier works in interfere the construction or under or if discovered, to and the or is the prepare it relevant the municipal public Heritage artefact archaeological place that maintain authorised, or discovery. a the not: fire Aboriginal object. area declaration 24-hour the an provisions. any of cultural of carried to damage erected any in practicable the Register the despoil, place survey an on out. or by contravene its is commencing each the the which to includes

Hazard statements

be damage, discovery, Victorian place Do protection order any If before given the intending a allow fail threatened. proposing If significant Effects required prepare the are Do deface, recorded which accordance without archaeological remove, structure conserve A an soon The Heritage unless a not purpose light apply) person archaeological Do damage, part Register. If relevant discovered, 30  undertaking days an a there to a Department owner effect prepare the recorded with charge consent of to provide a the light do in not a of to a or to: is as not of     Aboriginal to not: owner   not, of Do endanger period,          40 127(2), 131 39, 123, 129, 38, __________________________________________________________________________________________________________________________________________________________________ 122, s 128(3), 37, West EnergyConnect 34, Project | Victoria Plan 1958 Management Act 2017 Authority Environmental Act Heritage Fire Country Operational | 86 __________________________________________________________________________________________________________________________________________________________________ may that danger country the in and fire air way a during conditions a in open the unattended activity accordance ignition in with of source fire risk any use fire open-air fire in high unless discard result leave period conduct Victoria regulations. or a in any    West EnergyConnect Project | Plan Management Environmental Operational | 87 Work Instruction BUSINESS PRACTICE DOCUMENT Rehabilitation Plan – PEC-West Summary In 1-2 sentences, summarise the purpose of this work instruction. Revision no: 0 TRIM No: TBC Approval/ Still in draft Review date Business Major Projects Document Guidance function: type: document Lumea Yes ☐ No ☒ circulation: Author: Megan Calvert, Senior Environmental Approvals Coordinator Reviewers: Andrew Scott, Senior Environmental Business Partner Kim Lembke, Senior Environmental Business Partner Approver: Luke Fania, Environment and Sustainability Manager A printed copy of this document may not be the current version. Please refer to the Controlled and Business Practice Documents section in the Wire to verify the current version. TBC, Rehabilitation Plan – PEC-West, Work Instruction Revision 0 1 | _________________________________ BUSINESS PRACTICE DOCUMENT ________________________________________

SDS Library

Move your SDS library online today

Check Icon
Setup – Easy setup with our database of 16 million+ SDSs
Check Icon
Up-to-date – Your SDS get updated to latest versions.
Check Icon
Employee access – Tablets, Smartphones, or link from Corporate Intranet
Check Icon
Safety – One-click access to first aid information.
Check Icon
Labels – Generate Secondary Container Labels with just one click.