Operational elements

Liquids separation;

Revision date : 2023-03-15

SDS Library

Move your SDS library online today

Check Icon
Setup – Easy setup with our database of 16 million+ SDSs
Check Icon
Up-to-date – Your SDS get updated to latest versions.
Check Icon
Employee access – Tablets, Smartphones, or link from Corporate Intranet
Check Icon
Safety – One-click access to first aid information.
Check Icon
Labels – Generate Secondary Container Labels with just one click.
Health risk rating 1
Safety risk rating 1
Environmental risk rating 1

General Information

Revision date

2023-03-15

Product name

Operational elements

Icons in SDS

Company Information

company name

Liquids separation;

Section 2

Environmental hazards

Plan) Introduction or promotion of weeds • The Proposal has been sited to avoid clearing native vegetation; and/or disease, and temporary • Equipment, machinery, and vehicles will be restricted to impacts such as fire. designated roads, access tracks and cleared areas; • Weeds will be monitored throughout the project, and weed management will be implemented when and where required; • Alerts regarding harvest bans, vehicle movement bans, and total fire bans will be monitored during high-risk activities; and • All vehicles will be outfitted with a serviceable fire-extinguisher. Terrestrial Fauna “To protect terrestrial fauna so that Removal, fragmentation or Environmental Protection Act 1986; DWER; and DMIRS • The Proposal has been sited to avoid clearing native vegetation, No clearing of fauna habitat will be undertaken for the Proposal. biological diversity and ecological modification of habitat, and mortality therefore, no fauna habitat is proposed to be cleared; With the proposed management to avoid and mitigate secondary integrity are maintained” or displacement of individuals or Environmental Factor Guideline – • All ground disturbance, construction and operational activities risks to fauna, biological diversity and ecological integrity will be populations; and/or Terrestrial Fauna (EPA 2016b); and will be completed in accordance with a DMIRS approved EP as maintained; therefore, no significant impact on terrestrial fauna will required under PGER(E)R; occur as a result of the Proposal. No indirect impacts on areas of Increased dust, light, and/or noise Petroleum and Geothermal Energy • Dust suppression practices will be implemented to minimize nearby fauna habitat are expected. emissions, bushfires, vehicle collisions, Resources Act 1967 (DMIRS-approved significant dust-liftoff during construction; and attraction to onsite waste and/or Plan) • Vehicle speeds will be restricted to minimize dust-liftoff created water storage. by vehicular movement and reduce the potential for fauna collision; • The duration between site preparation and construction will be minimized. • All lighting will be directed onto the area of operation(s) to avoid potential light spill; • Equipment, machinery, and vehicles will be restricted to designated roads, access tracks and cleared areas to reduce potential noise pollution; • Alerts regarding harvest bans, vehicle movement bans, and total fire bans will be monitored during high-risk activities; • All vehicles will be outfitted with a serviceable fire-extinguisher; • Fencing (2.8 m in height) will be installed around the perimeter of the well site; • All wastes will be stored in containers with securely fitting lids prior to being disposed of offsite; • Fauna exclusion fencing will be installed around the perimeter of on-site water storage area(s); • Egress matting and ramps will be installed to enable ground- dwelling fauna (e.g., mammals, reptiles, etc.) to escape from water storage ponds; and • Daily trench inspections will be undertaken to ensure no ground- dwelling fauna are not trapped in water storage ponds. SER-HSE-REP-002 1 Factor Objective Potential Impact(s) Statute(s) Regulator(s) Proposed Management Outcome(s) Terrestrial Environmental Quality “To maintain the quality of land and Land-use practices causing soil Environmental Protection Act 1986; DWER; and DMIRS • Standard operating procedures will be implemented for The Proposal has been sited to avoid potential sensitivities. Soils soils so that environmental values are contamination; and/or handling and for the use of hazardous materials; could be impacted by a spill over an area of maximum 0.7 ha but protected” Environmental Factor Guideline – • All hazardous materials (including chemicals and hydrocarbons) would be recoverable within days leaving no ongoing impact to land Terrestrial Environmental Quality will be managed in accordance with the following standards: and soils. With the proposed management to avoid and mitigate (EPA 2016c); and o In accordance with AS 1940, hazardous materials will be secondary risks, the quality of land and soils can be maintained; stored in containment facilities designed to hold 110% of therefore, no significant impact on terrestrial environmental quality Petroleum and Geothermal Energy the capacity of the largest container or 25% of the total, will occur as a result of the Proposal. Resources Act 1967 (DMIRS-approved whichever is greater (e.g., via the use of bunded areas, etc.; Environment Plan). o Bunds are inspected during housekeeping inspections to Note: Soil contamination from a potential hydrocarbon spill under a determine integrity and maintenance of capacity worst-case scenario may impact an area of approximately 0.7 ha (83 o Storage containers will be labelled with the technical m × 83 m × 0.39 m) resulting in a predicted volume of 2,680 m3 of product name as per the Safety Data Sheet (SDS); contaminated soil. o Storage containers will be closed when not in use; and o Spill response equipment will be readily available at site of hazardous material storage or use. • Diesel and condensate storage tanks will be bunded; • Site drainage will be designed to contain runoff from areas at risk of spills (i.e., well pads); • Equipment, machinery, and vehicles will be restricted to designated roads, access tracks and cleared areas; • Equipment, machinery, and vehicles will be maintained, refueled, and serviced only where spill containment is in use (i.e., bunded areas); • Spill kits will always be available and used during all refueling operations; • A DMIRS approved Emergency Response Plan and an OSCP will be implemented; • Spill trajectory shows spill retained on lease and the well pad firebreak; • All spills are to be recorded and immediately cleaned up in accordance with the OSCP; and • Contaminated material is taken offsite for reuse or disposal. Failure to manage waste satisfactorily. • Specific waste segregation systems will be utilized onsite; • Covered waste receptacles will be used utilized onsite; • Waste hydrocarbon products will be stored in areas where spill containment is in use (i.e., bunded areas) prior to offsite Plan) • Equipment, machinery, and vehicles will be restricted to hydrocarbon spill under a worst-case scenario will occur. H e aquifer(s), without adequate designated roads, access tracks and cleared areas; Arrowsmith River is 8.8 km away from the indicative gas processing safeguards to prevent breaching of • Equipment, machinery, and vehicles will be maintained, plant at its closest point. natural seals or connecting aquifers. refueled, and serviced only where spill containment is in use (i.e., bunded areas); • Spill kits will always be available and used during all refueling operations; • A DMIRS-approved ERP and an OSCP will be implemented; • Spill trajectory shows spill retained on lease and the well pad firebreak; • All spills are to be recorded and immediately cleaned up in accordance with the OSCP; and • An existing licensed production bore will be utilized; therefore, abstraction volumes will occur within the current allocation. Social Surroundings ‘To protect social surroundings from Visual amenity impacts are expected Environmental Protection Act 1986; DWER; and DMIRS Management measures are detailed in the DMIRS approved EP. In Through the implementation of the EPA’s mitigation hierarchy, social significant harm’ to be highly localised and attenuated summary, the management and mitigation measures will include: surroundings are not significantly affected as a result of with distance to sensitive receptors • Screening or sheeting material (e.g., crushed rock, etc.) to implementation of this Proposal. Environmental Factor Guideline: Social and screening. be spread over well pads and access roads to minimise Surroundings (EPA 2016); dust; There will be: • Vehicle and machinery movements to be restricted to the • No impact to any Aboriginal sites, other heritage places, Noise levels will be in line with the Guidance Statement for the Development Envelope; requirements of the Environmental or non-aboriginal cultural heritage places; Assessment of Aboriginal heritage; No. • Protection (Noise) Regulations 1997 Vehicle speed restrictions to minimise dust; 41 (EPA 2004); • No noise or dust impacts on occupied sensitive receptors; • Dust suppression techniques such as watering, to be used and for noise sensitive premises. • when required; Aboriginal Heritage – Due Diligence No cumulative impacts on social surroundings are • Lighting to be directed towards the operation, light expected to occur. Guidelines (Version 3.0) (DAA & DPC No heritage values were identified 2013);and spillage on the surrounding areas to be minimised; within the Development Envelope • All personnel to be instructed via induction on landowner The EPA’s objective for Social Surroundings will therefore be met for based on the desktop assessment. and stakeholder sensitivities and related responsibilities Environmental Protection (Noise) the Proposal. The closest heritage site (the Regulations 1997. (e.g., dust control measures); Arrowsmith River ID 30068) is • Ongoing consultation with stakeholders; and approximately 5 km from the • A Site Discovery Procedure will be maintained and applied development envelope at the nearest in the event of a potential aboriginal cultural heritage point; approximately 8.8 km from the discovery. indicative gas processing facility. There will be no impact. There will be a temporary increase in noise and dust during construction activities, including earth moving, transport, stockpiling or loading of materials. Furthermore, there will be increased vehicle movement during the construction phase of the Proposal. During the operations phase, noise and air quality impacts are not anticipated due to the design and scale of the proposed facility. Given the isolated nature of the Project and the minimal noise2 and air emissions generated, no cumulative impacts have been identified with other projects referred to the EPA. 2 During steady state production operations, the head exchangers which produce an average noise reading of 85 decibels at 1 m. The heat exchangers are the noisiest component of the facility. Noise emissions will be assessed and managed as part of the DWER Part V licence and the DMIRS approved environmental plan. SER-HSE-REP-002 1 Referral Document Development 7 MATTERS OF NATIONAL ENVIRONMENTAL SIGNIFICANCE The Commonwealth EPBC Act provides a legal framework for the protection of MNES. The EPBC Act requires that all actions that will or may have a significant impact on a MNES must be referred to the Minister for the Environment via the DAWE. Protected matters under the EPBC Act include: • World heritage properties; • National heritage places (including Commonwealth Heritage Places); • Wetlands of international importance; • Listed threatened species and ecological communities; • Migratory species protected under international agreements; • Commonwealth marine areas; • A water resource, in relation to coal seam gas activities and large coal mining activities; • The Great Barrier Reef Marine Park; and • Nuclear Actions including uranium mining. In addition, protected matters include the environment where actions proposed will affect Commonwealth land or proposed actions are being undertaken by a Commonwealth agency. For consistency, the term Proposal is used in place of the “Proposed Action” and Development Envelope used in place of the “Proposed Action Area” for this section of the referral. 7.1 Significance Criteria Assessment The Proposed Action does not require for the disturbance of native vegetation; therefore, the habitat of MNES will not be impacted by the Proposal. The Proposal is located on pre- existing cleared land used for agricultural and firebreak purposes. Table 7-1 summarises the significance criteria assessment. The Proposal will not have an impact on MNES, and consequently has not been referred to the DCCEW under the EPBC Act. Table 7-1 Significance Criteria Assessment Matter of National Significance Presence/Potential Presence within Development Envelope World heritage properties Not applicable National heritage places Not applicable Wetlands of international importance Not applicable Listed threatened species and/or ecological There are no Threatened or Priority Ecological Communities within communities the Development Envelope. There are no anticipated indirect impacts outside of the Development Envelope due to the nature and scale of the proposal. Migratory species protected under international Not applicable agreements Commonwealth marine areas Not applicable A water resource, in relation to coal seam gas Not applicable activities and large coal mining activities The Great Barrier Reef Marine Park Not applicable Nuclear Actions including uranium mining Not applicable SER-HSE-REP-002 1 8 OFFSETS 8.1 Environmental Protection Authority’s Objective The EPA’s environmental objective for proposals that may require Environmental Offsets is to “counterbalance any significant residual environmental impacts and/or uncertainty through the application of offsets” (EPA 2014). 8.2 Policy and Guidance The following policies and guidance are relevant to offsets is: • Protection and Biodiversity Conservation Act 1999 (Commonwealth) Environmental Offsets Policy (Department of Sustainability, Environment, Water, Population and Communities, 2012); • WA Environmental Offsets Policy (Government of Western Australia, 2011); • Environmental Protection Bulletin Number 1: Environmental Offsets (EPA, 2008); • WA Environmental Offsets Guidelines (Government of Western Australia, 2014); and • Environmental Impact Assessment (Part IV Divisions 1 and 2) procedures manual (EPA, 2021b). Environmental offsets are ‘actions that provide environmental benefits which counterbalance the significant residual environmental impacts or risks of a proposal’ (EPA, 2014). The assessment and potential application of offsets for the Proposal has been undertaken with consideration of the following: To determine whether offsets were required, the potential environmental impacts, following the application of mitigation measures, were reviewed. The mitigation measures outlined in this supporting document were developed and applied based on the mitigation hierarchy: • Avoidance; • Minimisation; • Rehabilitation; and • Offsets. 8.3 Significant Residual Impact The management and mitigation measures are outlined under each environmental factor and have been considered when assessing the significant residual impact against the residual impact significance model provided within the WA Environmental Offsets Guidelines (EPA, 2014). SER-HSE-REP-002 1 8.4 Offset Strategy Applying the significance model to the residual impacts (Table 8-1), the Proponent has concluded that there will be no significant residual impacts and having regard for the WA Environmental Offsets Policy, does not believe that an offset is required. Table 8-1 Significance Model Residual Impact Significance Greenhouse Gases Residual impacts that are environmentally unacceptable and cannot be offset Not applicable Significant residual impacts that will require an offset Not applicable Significant residual impacts that may require an offset Not applicable Residual impacts that are not significant Not applicable SER-HSE-REP-002 1 9 HOLISTIC IMPACT ASSESSMENT This referral has provided an assessment of the potential environmental impacts associated with the Proposal. Based on the assessment undertaken, the Proponent considers that the residual impacts of the Proposal against these environmental factors are manageable. In considering the inextricable link between flora and vegetation, terrestrial fauna and inland waters, the connections and interactions between parts of the environment to inform a holistic view of impacts to the whole environment has been undertaken. The Proposal does not require the disturbance of native vegetation and resulting fauna habitat. Furthermore, given the lack of water dependent features in the Development Envelope and no proposed modification to surface or groundwater hydrological regimes; the Proposal has negligible potential to affect inland waters or any environmental values that are linked to their hydrological regime(s). The potential for impacts to Terrestrial Environmental Quality due to contamination, will be managed through the implementation of standard industry chemical storage, containment and response procedures. In the event of a spill, all contaminated material will be recovered and removed from site. Given the depth to groundwater and distance to surface water features, no impacts to groundwater are anticipated. On the above basis, when the separate environmental factors relevant to the Proposal are considered together, due to the environmental setting of the Development Envelope, the scale and nature of the Proposal and application of the mitigation hierarchy, the potential impacts from the Proposal on environmental values are considered to be manageable. Based on the assessment undertaken in this referral and the predicted outcomes with respect to the key environmental factors, the Proponent is of the view that the potential impacts of the Proposal are not significant as to warrant formal environmental impact assessment under the EP Act. The Proponent considers that the environmental impacts associated with the Proposal can be adequately assessed and managed via other State and Commonwealth approvals processes. SER-HSE-REP-002 1 10 CONSIDERATION OF SIGNIFICANCE In reaching a decision as to whether a proposal is likely to have a significant effect on the whether it is likely to meet its objectives for environmental factors and consequently, whether a referred proposal should be assessed, the EPA may have regard to the following: A) Values, sensitivity and quality of the environment which is likely to be impacted. B) Extent (intensity, duration, magnitude and geographic footprint) of the likely impacts. C) Consequence of the likely impacts (or change). D) Resilience of the environment to cope with the impacts or change. E) Cumulative impact with other existing or reasonably foreseeable activities, developments and land uses. F) Connections and interactions between parts of the environment to inform a holistic view of impacts to the whole environment. G) Level of confidence in the prediction of impacts and the success of proposed mitigation. H) Public interest about the likely effect of the proposal or scheme, if implemented, on the environment, and public information that informs the EPA’s assessment. A significance test for the Proposal has been undertaken against each of these criteria (Table 10-1). SER-HSE-REP-002 1 Table 10-1 Consideration of Significance Criteria Assessment A) Values, sensitivity and quality of the The Proposal does not require the disturbance of environment which is likely to be impacted native vegetation and impacts on the health of other B) Extent (intensity, duration, magnitude and elements of the environment, including terrestrial geographic footprint) of the likely impacts fauna and inland waters, have been avoided C) Consequence of the likely impacts (or change) entirely. D) Resilience of the environment to cope with the impacts or change E) Cumulative impact with other existing or reasonably foreseeable activities, developments and land uses F) Connections and interactions between parts of A holistic assessment has been undertaken in the environment to inform a holistic view of impacts to the whole environment G) Level of confidence in the prediction of The level of confidence in the predicted outcomes impacts and the success of proposed from the Proposal is high given that the key impacts mitigation are direct impacts which are quantifiable and well understood. The environmental impacts of this Proposal will be addressed through the management measures identified within each environmental factor. H) Public interest about the likely effect of the A comprehensive stakeholder consultation process proposal or scheme, if implemented, on the was undertaken during the planning and design of and public information that the Proposal to identify and address concerns. informs the EPA’s assessment Stakeholder consultation will continue throughout the life of the Proposal through to closure. The Proposal is expected to generate public concern given the interest in oil and gas activities generally and the level of exploration and development in the region. These concerns are expected to focus on hydraulic fracture stimulation; however, no hydraulic fracture stimulation is proposed within this Proposal. SER-HSE-REP-002 1 11 REFERENCES Australian Government Clean Energy Regulator (2021) Greenhouse gases and energy. Accessed at: http://www.cleanenergyregulator.gov.au/NGER/About-the-National-Greenhouse-and-Energy- Reporting-scheme/Greenhouse-gases-and-energy. Bureau of Meteorology (2021) Climate statistics for Australian locations: Badgingarra Research Station, Accessed at: http://www.bom.gov.au/climate/averages/tables/cw_009037.shtml. CSIRO and Bureau of Meteorology (2021). Western Australia's changing climate. Retrieved from: https://www.climatechangeinaustralia.gov.au/en/changing-climate/state-climate- statements/western-australia/. Department of Aboriginal Affairs (DAA) and Department of the Premier and Cabinet (DPC) (2013) Aboriginal Heritage Due Diligence Guidelines, Version 3.0. Department of Climate Change, Energy, the Environment and Water (DCCEW) Australian Heritage Database. Accessed at: https://www.dcceew.gov.au/parks-heritage/heritage/publications/australian-heritage- database. March 2023. Department of Industry, Science, Energy and Resources (DISER) (2019) State and Territory Greenhouse Gas Inventories 2019. Accessed at: https://www.industry.gov.au/data-and-publications/state-and-territory- greenhouse-gas-inventories. Department of Planning, Lands and Heritage (DPLH) Aboriginal Heritage Inquiry System. Accessed at: https://espatial.dplh.wa.gov.au/AHIS/index.html?viewer=AHIS. March 2023. Department of Water and Environment Regulation (DWER) (2020) Western Australian Climate Policy; A plan to position Western Australia for a prosperous and resilient low-carbon future. Environmental Protection Authority (EPA) (2004) Guidance for the Assessment of Environmental Factors; Assessment of Aboriginal Heritage, No. 41. Environmental Protection Authority (EPA) (2016) Environmental Factor Guideline Social Surroundings. Environmental Protection Authority (EPA) (2016) Environmental Protection Bulletin Number 1: Environmental Offsets – Biodiversity. Environmental Protection Authority (EPA) (2016) Western Australian Environmental Offsets Policy, Government of Western Australia. Environmental Protection Authority (EPA) (2016) WA Environmental Offsets Guidelines, Government of Western Australia. Environmental Protection Authority (EPA) (2016) Environmental Factor Guideline Flora and Vegetation. Environmental Protection Authority (EPA) (2016) Environmental Factor Guideline Terrestrial Fauna. Environmental Protection Authority (EPA) (2016) Environmental Factor Guideline Terrestrial Environmental Quality. Environmental Protection Authority (EPA) (2018) Environmental Factor Guideline Inland Waters. Environmental Protection Authority (EPA) (2023) Environmental Factor Guideline Greenhouse Gas Emissions. Environmental Protection Authority (EPA) (2020) Environmental Factor Guideline Air Quality. Environmental Protection Authority (EPA) (2021) Statement of Environmental Principles, Factors, Objectives and Aims of EIA. Environmental Protection Authority (EPA) (2021) Environmental Impact Assessment (Part IV Divisions 1 and 2) procedures manual, Requirements under the Environmental Protection Act 1986 (WA). SER-HSE-REP-002 1 Government of Western Australia Heritage Council Heritage Place Search. Accessed at: http://inherit.stateheritage.wa.gov.au/Public/. March 2023. Greenhouse Gas Emissions Policy for Major Projects (Government of WA) 2019. Retrieved from: https://www.der.wa.gov.au/images/documents/your-environment/climate- change/Greenhouse%20Gas%20Emissions%20Policy%20for%20Major%20Projects.pdf. SER-HSE-REP-002 1 Referral Document Development Exploration Stakeholder Updated: Method of Nature of the Consultation Close out of Issues (if any) Permit Consultation EP 503 Department of Mines, Industry Regulation and 15/03/2023 Email Strike Energy - February 2023 No Current Issues Safety (WA) (DMIRS) Environmental Recordable Incident Reports EP 503 Regulatory 1/03/2023 Email RE: EP 503 AAR Jan 2023 No Current Issues EP 503 Landholder 27/02/2023 Phone Notify of farm access No Current Issues EP 503 Department of Water and Environmental 27/02/2023 Email Fwd Updated: Application 054696 has been No Current Issues Regulation (DWER) successfully submitted and is awaiting review EP 503 Heritage / Native Title 21/02/2023 Email Activity Notice - South Erregulla Exploration No Current Issues Drilling Activity EP 503 Department of Mines, Industry Regulation and 20/02/2023 Email EP 503 AAR Jan 2023 No Current Issues Safety (WA) (DMIRS) EP 503 Community Event / Investment 16/02/2023 Phone Invitation to be part of the Arrowsmith No Current Issues Development Cluster and attend the first working group meeting EP 503 Department of Mines, Industry Regulation and 16/02/2023 Email RE: EP 503 - Notice of Non-compliance - No Current Issues Safety (WA) (DMIRS) Permit Year 1 -Required Actions EP 503 Department of Mines, Industry Regulation and 14/02/2023 Email Assessment Timeframe for South Erregulla No Current Issues Safety (WA) (DMIRS) Explorations Wells Environment Plan (SER- HSE-PLN-001, Rev 3) EP 503 Landholder 14/02/2023 Phone Informed of INPEX visit No Current Issues EP 503 Regulatory 14/02/2023 Email Strike Energy - January 2023 Environmental No Current Issues Recordable Incident Reports EP 503 Land Access Discussions 7/02/2023 Email Introduce Neil and Aaron to discuss land No Current Issues access EP 503 Department of Mines, Industry Regulation and 25/01/2023 Email RE: EP 503 - Notice of Non-compliance - No Current Issues Safety (WA) (DMIRS) Permit Year 1 EP 503 Department of Mines, Industry Regulation and 16/01/2023 Email Strike Energy - October 2022 Environmental No Current Issues Safety (WA) (DMIRS) Recordable Incident Reports EP 503 Department of Mines, Industry Regulation and 16/01/2023 Email Strike Energy - Q4 2022 Quarterly Emissions No Current Issues Safety (WA) (DMIRS) and Discharges Reports EP 503 Department of Mines, Industry Regulation and 23/12/2022 Email EP 503 - Notice of Non-compliance - Permit No Current Issues Safety (WA) (DMIRS) Year 1 EP 503 Department of Mines, Industry Regulation and 20/12/2022 Email RE: STP-LNA-0010 - EP 503 - DOL - South No Current Issues Safety (WA) (DMIRS) Erregulla - RFI Advice EP 503 Department of Mines, Industry Regulation and 15/12/2022 Email Strike Energy - November 2022 No Current Issues Safety (WA) (DMIRS) Environmental Recordable Incident Reports SER-HSE-REP-002 1 Exploration Stakeholder Updated: Method of Nature of the Consultation Close out of Issues (if any) Permit Consultation EP 503 Department of Mines, Industry Regulation and 13/12/2022 Email RE: Survey Applications - SOP-SYA-0266, No Current Issues Safety (WA) (DMIRS) SOP-SYA-0267, SOP-SYA-0268, SOP-SYA- 0269, SOP-SYA-0270 EP 503 Land Access Discussions 10/12/2022 Face to Face Discuss Neoen proposal No Current Issues EP 503 Land Access Discussions 9/12/2022 Face to Face Discuss Neoen proposal No Current Issues EP 503 Land Access Discussions 2/12/2022 Face to Face Introduction Haber project and Neoen No Current Issues EP 503 Community Event / Investment 17/11/2022 Email Expressed interest in Christmas tree No Current Issues function donation. Received letter and made contributions. EP 503 Operational information 17/11/2022 Phone Discussed lease agreement for Kingia Plains No Current Issues EP 503 Department of Mines, Industry Regulation and 17/11/2022 Email Fwd South Erregulla 1 Acceptance of No Current Issues Safety (WA) (DMIRS) Discovery Assessment Report EP 503 Operational information 15/11/2022 Face to Face Crispin visited farm and discussed farm No Current Issues lease and future of project EP 503 Operational information 10/11/2022 Phone Notify contractor will access property for No Current Issues gravel pick up EP 503 Operational information 8/11/2022 Face to Face Spring survey notification and introduced No Current Issues the NEOEN windfarm project EP 503 Landholder 7/11/2022 Phone Notify of spring survey visit No Current Issues EP 503 Shire of Mingenew 4/11/2022 Email Meeting between CEO and Strike to explain No Current Issues Haber project EP 503 Other 2/11/2022 Phone Informed of overgrown trees which creates No Current Issues a hazard to fence and access track EP 503 Operational information 1/11/2022 Phone Russell enquired about pallets on SE1. No Current Issues Strike enquired about new farm lessee communication EP 503 Shire of Mingenew 28/10/2022 Email New CEO for Shire of Mingenew introduced No Current Issues himself and enquired to meet in Perth on Friday. Replied and confirmed meeting time. EP 503 Department of Mines, Industry Regulation and 28/10/2022 Email Strike Energy - Q3 2022 Quarterly Emissions No Current Issues Safety (WA) (DMIRS) and Discharges Reports EP 503 Community Event / Investment 18/10/2022 Email Enquiry about sponsorship for Blue Light No Current Issues Disco on Halloween for school children EP 503 Landholder 18/10/2022 Phone Enquired about shed space to store No Current Issues equipment. SER-HSE-REP-002 1 Exploration Stakeholder Date Method of Nature of the Consultation Close out of Issues (if any) Permit Consultation EP 503 Department of Mines, Industry Regulation and 17/10/2022 Email FW: Acknowledgement of Discovery No Current Issues Safety (WA) (DMIRS) Notification - EP 503 Landholder 11/10/2022 Phone Notify consultant visit to undertake soil No Current Issues survey EP 503 Regulatory 7/10/2022 Email RE: Advice - STG-EPA-0009 – and associated No Current Issues section 69A (PEGRA67) - Strike EP 503 Operational information 4/10/2022 Phone Provide operational update incl SE1 well No Current Issues testing.Mentioned increased roo activity possibly from being pushed out of UCL area by operation and testing noise EP 503 Operational information 4/10/2022 Phone Provide operational update incl SE 1 vwell No Current Issues testing EP 503 Operational information 4/10/2022 Face to Face Call into farm to provide operational update No Current Issues incl SE1 well testing EP 503 Operational information 4/10/2022 Face to Face Provided operational update, SE1 well No Current Issues testing and future drilling EP 503 Land Access Discussions 20/09/2022 Email Land Access for Spring survey No Current Issues EP 503 Landholder 20/09/2022 Phone Notify of spring survey No Current Issues EP 503 Department of Mines, Industry Regulation and 19/09/2022 Email RE South Erregulla 1 Acceptance of No Current Issues Safety (WA) (DMIRS) Discovery Assessment Report EP 503 Landholder 19/09/2022 Phone Inform landholder contractor visit will be No Current Issues delayed EP 503 Department of Mines, Industry Regulation and 16/09/2022 Email South Erregulla 1: Acceptance of Discovery No Current Issues Safety (WA) (DMIRS) Assessment Report EP 503 Operational information 15/09/2022 Phone Provided feedback regarding contractor No Current Issues accessing farm for testing EP 503 Department of Mines, Industry Regulation and 14/09/2022 Email Strike Energy - August 2022 Environmental No Current Issues Safety (WA) (DMIRS) Recordable Incident Reports EP 503 Operational information 12/09/2022 Phone Confirm road maintenance on Tomkins Rd. No Current Issues EP 503 Operational information 9/09/2022 Phone Informed of upcoming SE-1 well testing, No Current Issues road maintenance, voucher at Southerly's and farm lease advertisement. EP 503 Landholder 8/09/2022 Phone Provided update on SE operations, road No Current Issues maintenance and farm lease tender process EP 503 Operational information 8/09/2022 Phone Left a message No Current Issues EP 503 Operational information 8/09/2022 Face to Face Upcoming Wagina testing and voucher at No Current Issues SER-HSE-REP-002 1 Exploration Stakeholder Updated: Method of Nature of the Consultation Close out of Issues (if any) Permit Consultation Southerly's EP 503 Operational information 6/09/2022 Phone Road closure and well testing No Current Issues EP 503 Landholder 6/09/2022 Phone Road maintenance on Tomkins Rd No Current Issues EP 503 Community Enquiry / Consultation 2/09/2022 Meeting Haber fertiliser plant presentation to Shire No Current Issues of Mingenew Councillors EP 503 Landholder 1/09/2022 Email Forward Beach request No Current Issues EP 503 Land Access Discussions 1/09/2022 Phone Enquiry about completion of spring survey No Current Issues EP 503 Indirect Land Holder Consultation 29/08/2022 Phone Phone Call | Mark Fogarty from PenAgri No Current Issues EP 503 Landholder 26/08/2022 Phone Land access for helicopter visit No Current Issues EP 503 Landholder 24/08/2022 Phone Provided information on Topographical No Current Issues aerial survey via fixed wing aircraft scheduled for 24/8/22 EP 503 Community Event / Investment 19/08/2022 Face to Face Presentation at Ag Connect WA Northern No Current Issues Networking event EP 503 Landholder 8/08/2022 Phone Enquired about farm visit on Thursday by No Current Issues third party EP 503 Community Enquiry / Consultation 5/08/2022 Phone Industry Leaders Forum No Current Issues EP 503 Community Enquiry / Consultation 27/07/2022 Face to Face Community Information session Three No Current Issues Springs EP 503 Community Enquiry / Consultation 26/07/2022 Face to Face Community information session in Three No Current Issues Springs EP 503 Feedback 20/07/2022 Phone Farm lease No Current Issues EP 503 Community Enquiry / Consultation 19/07/2022 Email Invite all landholders and stakeholders to No Current Issues attend community information session in Three Springs 26th and 27th July EP 503 Landholder 19/07/2022 Phone Land access for site inspection No Current Issues EP 503 Department of Mines, Industry Regulation and 15/07/2022 Email Strike Energy - Q2 2022 Quarterly Emissions No Current Issues Safety (WA) (DMIRS) and Discharges Reports EP 503 Landholder 6/07/2022 Phone Notification of personnel in the area on No Current Issues Friday 08/07/2022 EP 503 Regulatory 24/06/2022 Face to Face Conduct Heritage survey over SE, Haber and No Current Issues construction camp EP 503 Direct Land Holder Consultation 24/06/2022 Face to Face Meet on farm to inspect survey area. No Current Issues EP 503 Shire of Three Springs 22/06/2022 Phone Enquire about site visit to old camp No Current Issues location. SER-HSE-REP-002 1 Exploration Stakeholder Updated: Method of Nature of the Consultation Close out of Issues (if any) Permit Consultation EP 503 Landholder 21/06/2022 Phone Enquired if available on Thursday to meet No Current Issues engineer. Check for any requirements on the heritage survey. EP 503 Department of Mines, Industry Regulation and 21/06/2022 Phone Nomination of Operator process under No Current Issues Safety (WA) (DMIRS) Work Health and Safety (Petroleum and Geothermal Energy Operations) Regulations 2022 - NoD letter EP 503 Inquiry 17/06/2022 Phone Enquiry about Haber Precinct meeting to No Current Issues find out what it means for the area EP 503 Community Enquiry / Consultation 16/06/2022 Phone Re: YSRC Heritage Survey - Haber and SE3 No Current Issues and SE4. EP 503 Shire of Three Springs 15/06/2022 Phone Enquired about timeline for Haber project No Current Issues EP 503 Operational information 15/06/2022 Phone Strike purchasing neighboring property; No Current Issues expressed interest to lease farm. EP 503 Department of Mines, Industry Regulation and 15/06/2022 Email FW: South Erregulla 1 Discovery Report - No Current Issues Safety (WA) (DMIRS) Request for extension EP 503 Department of Mines, Industry Regulation and 15/06/2022 Email Strike Energy - May 2022 Environmental No Current Issues Safety (WA) (DMIRS) Recordable Incident Reports EP 503 Inquiry 10/06/2022 Phone Enquire about crane supply opportunity No Current Issues EP 503 Notice 10/06/2022 Phone Notify Noise monitoring equipment pickup No Current Issues EP 503 Notice 10/06/2022 Phone Notify of noise monitoring equipment pick No Current Issues up EP 503 Heritage / Native Title 9/06/2022 Meeting Geraldton Aboriginal Business Forum No Current Issues Attendance EP 503 Inquiry 9/06/2022 Phone Enquire about fertiliser manufacturing No Current Issues plant, timeline and cooperation with wind mills EP 503 Community Event / Investment 9/06/2022 Meeting Sponsor, attend and present at the No Current Issues Aboriginal Business Forum in Geraldton EP 503 Inquiry 8/06/2022 Phone Congratulate on move of fertiliser plant to No Current Issues Shire of Three Springs EP 503 Shire of Irwin 8/06/2022 Meeting Present the relocation of fertiliser No Current Issues manufacturing plant to Shire of Three Springs EP 503 Shire of Three Springs 8/06/2022 Meeting Meet at shire council to present on the No Current Issues fertiliser manufacturing facility being built SER-HSE-REP-002 1 Exploration Stakeholder Updated: Method of Nature of the Consultation Close out of Issues (if any) Permit Consultation within shire EP 503 Community Event / Investment 8/06/2022 Face to Face Filming video on SE1 for Shire of Irwin No Current Issues EP 503 Inquiry 7/06/2022 Phone Enquired regarding Haber Precinct and No Current Issues expressed collaboration interest for R&D project EP 503 Landholder 3/06/2022 Phone Well test schedule No Current Issues EP 503 Landholder 26/05/2022 Phone Provided update on SE1 testing time line. No Current Issues They are in Dongara. Enquired about helicopter landing next week. Discussed possible locations, will get back next Monday. EP 503 Shire of Irwin 26/05/2022 Email Industry Leaders Workshop - follow-up No Current Issues forum with State Government Minister's/agencies - promotional video EP 503 Land Access Discussions 23/05/2022 Phone Discussed noise monitoring during SE1 well No Current Issues testing EP 503 Land Access Discussions 23/05/2022 Phone Discuss Noise monitoring around house and No Current Issues shed during SE1 well testing EP 503 Operational information 23/05/2022 Email Enquired availability to meet Friday 27th No Current Issues May EP 503 Operational information 23/05/2022 Email Asked availability for a meeting No Current Issues EP 503 Landholder 20/05/2022 Phone Informed of well test timing and discussed No Current Issues accommodation booking EP 503 Landholder 17/05/2022 Email Notification for well testing timing No Current Issues EP 503 Department of Mines, Industry Regulation and 16/05/2022 Email Strike Energy - April 2022 Environmental No Current Issues Safety (WA) (DMIRS) Recordable Incident Reports EP 503 Department of Mines, Industry Regulation and 16/05/2022 Email Strike Energy - April 2022 Petroleum No Current Issues Safety (WA) (DMIRS) Monthly Status Reports EP 503 Heritage / Native Title 12/05/2022 Email Review of existing quotes - and 2 new No Current Issues activity notices EP 503 Department of Mines, Industry Regulation and 12/05/2022 Email RE: Request for further information on EP No Current Issues Safety (WA) (DMIRS) 503 Annual Assessment Report EP 503 Notice 11/05/2022 Email Notify Fauna consultant visit for 12/5/22 No Current Issues EP 503 Land Access Discussions 6/05/2022 Phone Flora survey report No Current Issues EP 503 Land Access Discussions 6/05/2022 Email Fauna survey land access No Current Issues EP 503 Land Access Discussions 3/05/2022 Phone Strike activities and Fauna survey No Current Issues SER-HSE-REP-002 1 Exploration Stakeholder Updated: Method of Nature of the Consultation Close out of Issues (if any) Permit Consultation EP 503 Heritage / Native Title 22/04/2022 Email FW: Introduction - and Heritage Survey EP No Current Issues 503 EP 503 Department of Mines, Industry Regulation and 20/04/2022 Email RE: Request for further information on EP No Current Issues Safety (WA) (DMIRS) 503 Annual Assessment Report EP 503 Department of Mines, Industry Regulation and 19/04/2022 Email Strike Energy - Q1 2022 Quarterly Emissions No Current Issues Safety (WA) (DMIRS) and Discharges Reports EP 503 Department of Water and Environmental 7/02/2022 Email RE: CAW206173 - South Erregulla No Current Issues Regulation (DWER) EP 503 Department of Mines, Industry Regulation and 18/01/2022 Meeting Regulatory Update No Current Issues Safety (WA) (DMIRS) EP 503 Department of Mines, Industry Regulation and 17/01/2022 Email Strike Energy - Q4 2021 Quarterly Emissions No Current Issues Safety (WA) (DMIRS) and Discharges Reports EP 503 Department of Mines, Industry Regulation and 15/03/2023 Email Strike Energy - February 2023 No Current Issues Safety (WA) (DMIRS) Environmental Recordable Incident Reports SER-HSE-REP-002 1

Disposal

All personnel will undergo site inductions related to waste management requirements; and • Offsite disposal of waste will be undertaken via licensed contractors Inland Waters “To maintain the hydrological regimes Direct discharge of waste to surface Environmental Protection Act 1986; DWER; and DMIRS • The Proposal has been sited to avoid surface water features; The Proposal has been sited to avoid potential hydrological and quality of groundwater and water systems; • The Proposal does not alter any surface hydrological regime; sensitivities. Given the lack of water dependent features in the surface water so that environmental Drainage construction directly Environmental Factor Guideline – • Surface water management structures (i.e., bunds) will be Development Envelope and no proposed modification to surface or values are protected” impacting on wetlands or waterways, Inland Waters (EPA 2016d); and installed to divert rainfall, minimize erosion and the transport groundwater hydrological regimes; therefore, the Proposal will have or which leads to the discharge of of sediment(s) to the surrounding environment. negligible potential to affect inland waters or any environmental drainage water to wetlands or Petroleum and Geothermal Energy • Site drainage will be designed to contain runoff from areas at values that are linked to their hydrological regime(s). No Resources Act 1967 (approved waterways; and/or risk of spills (i.e., well pads); contamination of the Arrowsmith River resulting from a potential SER-HSE-REP-002 1 Factor Objective Potential Impact(s) Statute(s) Regulator(s) Proposed Management Outcome(s) Drilling of wells which intercept an

SDS Library

Move your SDS library online today

Check Icon
Setup – Easy setup with our database of 16 million+ SDSs
Check Icon
Up-to-date – Your SDS get updated to latest versions.
Check Icon
Employee access – Tablets, Smartphones, or link from Corporate Intranet
Check Icon
Safety – One-click access to first aid information.
Check Icon
Labels – Generate Secondary Container Labels with just one click.