Trigger Tasks Exposure below 500 µg/m3. Examples include manual dry scraping and sanding, manual demolition of structures, heat gun applications, power tool cleaning with dust collection systems, and spray painting with lead-based paint

2 Trigger Tasks Exposure above 500 µg/m3. Examples include lead burning, using lead

Revision date : 2024-02-28

SDS Library

Move your SDS library online today

Check Icon
Setup – Easy setup with our database of 16 million+ SDSs
Check Icon
Up-to-date – Your SDS get updated to latest versions.
Check Icon
Employee access – Tablets, Smartphones, or link from Corporate Intranet
Check Icon
Safety – One-click access to first aid information.
Check Icon
Labels – Generate Secondary Container Labels with just one click.
Health risk rating 1
Safety risk rating 1
Environmental risk rating 1

General Information

Version

for this plan, start with “0”. Track all subsequent changes/modifications in sequential

Revision date

2024-02-28

Product name

Trigger Tasks Exposure below 500 µg/m3. Examples include manual dry scraping and sanding, manual demolition of structures, heat gun applications, power tool cleaning with dust collection systems, and spray painting with lead-based paint

Product name

Trigger Tasks Exposure below 500 µg/m3. Examples include manual dry scraping and sanding, manual demolition of structures, heat gun applications, power tool cleaning with dust collection systems, and spray painting with lead-based paint

Identification on the label/Trade name

Time

1.2.1 Relevant identified uses

MODIFIED

1.2.2. Uses advised against

TABLE 1

Manufacturer Name

or greater, and have a filter with 99% or greater

Icons in SDS

Company Information

company name

2 Trigger Tasks Exposure above 500 µg/m3. Examples include lead burning, using lead

Section 2

2.2 Label elements

signs and labels. 18.7.1 waste, etc. as specified in the Radiological Work Plan. Develop a Radiological Provide copies Work Plan that is 1) of ​LLNS​ documents commensurate with the and relevant task and radiological ​LLNS​ sampling and conditions and 2) in survey procedures accordance with Sections 14.2 Work Planning (HP-FO procedures). MAN-2050, and and 14.3 Review and concur ​LLNS​ applicable with Radiological procedures (HP-FO Work Plan for procedures). Submit compliance with Radiological Work Plan for ​LLNS​ requirements. ​LLNS​ review and concurrence. In the Subcontractor’s Radiological Work Plan, specify radiological Conducting Sections 3.3, 6, controls for the intended Routine General 7, and 12 tasks and radiological Radiological Work hazards (e.g. dispersible material handling, decontamination, etc.). Lawrence Livermore National Laboratory Radiological Safety Requirements LLNL Facilities Master Specification (rev. 8 June 2024) Section 01 35 23.23 - Page 8 UNCONTROLLED UNCLASSIFIED INFORMATION DocuSign Envelope ID: 269A6DB7-7944-42BC-BBEA-131DAD73AA51 LLNL-MI-2000182 PMO.DT-ST-02 Subcontractor LLNL Program Element Sub-element LLNS responsibility responsibility MAN-2050 reference Specify PPE requirements for tasks. Maintain an established Radiologically Controlled Area throughout the Conducting Access duration of the project Section 5.1 Routine control and control access. Radiological Work Provide specifics in the Subcontractor’s Radiological Work Plan. Implement requirements as specified in Monitoring Conduct area Subcontractor’s Chapter 8, Conducting the Work monitoring at the Radiological Work Plan. Sections 18.7.7, Routine Environment, perimeter of the and 18.8.4 Radiological Work Radiation Subcontractor work Conduct area monitoring Monitoring areas as needed. to detect radiological changes and identify adverse trends. Implement controls as specified in the Subcontractor’s Provide LLNS Health Radiological Work Plan. Physicist IST HP Reference Conducting Airborne review and signature Sections 3.8 ​LLNS​ procedures in Routine radioactivity on all sample results. and 8.4 describing how air Radiological Work controls Provide all sampling/air monitoring radioactive sample will be performed. Submit analyses. samples and report results using ​LLNS​ database / reporting form. Check instrument calibration and function. Instrument Conducting Provide calibrated Report any issues to the Calibration Routine instrumentation, as LLNS H&S tech or IST HP. Section 15.1 and Radiological Work needed. Take damaged, out-of- Maintenance calibration and/or, non- functioning instruments Lawrence Livermore National Laboratory Radiological Safety Requirements LLNL Facilities Master Specification (rev. 8 June 2024) Section 01 35 23.23 - Page 9 UNCONTROLLED UNCLASSIFIED INFORMATION DocuSign Envelope ID: 269A6DB7-7944-42BC-BBEA-131DAD73AA51 LLNL-MI-2000182 PMO.DT-ST-02 Subcontractor LLNL Program Element Sub-element LLNS responsibility responsibility MAN-2050 reference out of service and return to H&S tech. Develop and implement controls compliant with ​LLNS​ requirements. Provide sampling and RCT staff are responsible survey procedures. for performing official Provide IST HP review “documented surveys” Conducting Release of and signature on all and swipe sampling prior Section 9.8 Routine Materials and documented surveys to releasing equipment or Radiological Work Equipment and sample results. materials from Provide all rad sample radiological controls. analyses. Submit samples and report results utilizing ​LLNS​ database / reporting form. Identify and report off- normal events in a timely Review and concur manner to the ​STR​ and IST with Subcontractor Conducting HP. Investigate and Off-Normal off-normal Routine propose corrective actions Section 12.4 Situations investigations and Radiological Work to prevent recurrence. proposed corrective Update Subcontractor’s actions. Radiological Work Plan as needed. Ensure workers have the skills, knowledge, and ability to work safely in and around radiological Provide or grant Radiation Safety hazards and capable of Chapter 16 General equivalency for LLNS Training successfully completing Rad Worker training. ​LLNS​ training as required. Maintain radiological training documentation at job site. Provide training to Ensure RCTs have the Sections 4.7 Radiation Safety Specialized RCTs on LLNS skills, knowledge, and and 4.9, Training training instrumentation, ability to perform their Chapter 16 Lawrence Livermore National Laboratory Radiological Safety Requirements LLNL Facilities Master Specification (rev. 8 June 2024) Section 01 35 23.23 - Page 10 UNCONTROLLED UNCLASSIFIED INFORMATION DocuSign Envelope ID: 269A6DB7-7944-42BC-BBEA-131DAD73AA51 LLNL-MI-2000182 PMO.DT-ST-02 Subcontractor LLNL Program Element Sub-element LLNS responsibility responsibility MAN-2050 reference sample database, assigned duties. survey and sample forms, swipe techniques and radiological procedures. Provide facility specific training as required. Provide training on LLNS forms and Provide completed forms databases. Provide IST and sampling documents Records HP support to review Chapter 17 to ​LLNS​ throughout the and approve project. documented surveys performed by RCTs. ADDITIONAL REQUIREMENTS FOR WORK WITH RADIOACTIVE MATERIALS Properly package, characterize, and label Radioactive Provide packaging waste following and mixed requirements and ​LLNS​ guidance and Chapter 10 waste disposal. procedures. Turn over waste to ​LLNS​ for disposal. Sealed Specify SRS controls and Radioactive procedures in Radiological Source (SRS) Work Plan. Include the Chapter 9 Accountability storage and control and Control (accountability) of sources. ADDITIONAL REQUIREMENTS FOR WORK WITH RADIATION GENERATING DEVICES (RGD) Obtain ​LLNS​ approval prior to bringing RGDs Acquisition of Provide required on-site. Provide written RGDs for reviews and procedures for operation, Section 18.5.1 project use. approvals. interlock tests and radiation beam alignment. Obtain prior approval for Lawrence Livermore National Laboratory Radiological Safety Requirements LLNL Facilities Master Specification (rev. 8 June 2024) Section 01 35 23.23 - Page 11 UNCONTROLLED UNCLASSIFIED INFORMATION DocuSign Envelope ID: 269A6DB7-7944-42BC-BBEA-131DAD73AA51 LLNL-MI-2000182 PMO.DT-ST-02 Subcontractor LLNL Program Element Sub-element LLNS responsibility responsibility MAN-2050 reference safety system modification or disablement. Provide written Field procedures for work Sections 18.5.3 radiography involving field and 18.8.6 applications radiography equipment. Subcontractor must ensure by procedure and Control of administrative controls Section 18.10.3 RGDs that RGDs can only be operated by authorized and trained individuals. END OF SECTION 01 35 23.23 Lawrence Livermore National Laboratory Radiological Safety Requirements LLNL Facilities Master Specification (rev. 8 June 2024) Section 01 35 23.23 - Page 12 UNCONTROLLED UNCLASSIFIED INFORMATION DocuSign Envelope ID: 269A6DB7-7944-42BC-BBEA-131DAD73AA51 LLNL-MI-2000182 PMO.DT-ST-02 SECTION 01 35 23.25 BERYLLIUM EXPOSURE PREVENTION PART 1 GENERAL 1.1 SECTION INCLUDES 1.1.1 Beryllium exposure prevention requirements to ensure compliance with the requirements of 10 CFR 850​ (the “Rule”). 1.2 APPLICABILITY 1.2.1 This section applies to subcontracted work where a worker may be occupationally exposed to beryllium through either dermal or inhalation routes. As designated herein, the Subcontractor in charge of the particular activity is primarily responsible for complying with the Rule as the designated “responsible contractor.” 1.3 REFERENCES 1.3.1 10 CFR 850 - Chronic Beryllium Disease Prevention Program; 2022. 1.3.2 DOE-STD-1187 - Beryllium-Associated Worker Registry Data Collection and Management Guidance; 2019. 1.4 DEFINITIONS BeLPT. Beryllium lymphocyte proliferation test. beryllium-associated worker. A worker who was in the past or is currently exposed or potentially exposed to beryllium at a Department of Energy (DOE) facility. Exposure may be due to work with or around beryllium or through incidental exposure. The term includes current beryllium workers, past beryllium workers, incidentally exposed workers, workers whose work history shows that they may have been exposed to beryllium, workers who exhibit signs and symptoms of beryllium exposure, and workers who are receiving medical removal protection benefits. beryllium-affected worker. A current worker who is diagnosed by an occupational medical provider as having a beryllium-exposure (e.g., probable sensitized, sensitized, or chronic beryllium disease). CBDPP. LLNS Chronic Beryllium Disease Prevention Program. HSD. LLNS health services director. list. The list of beryllium-associated workers as required under 10 CFR 850.34(a)(4). probable sensitized workers. Beryllium-associated workers who have been tested and determined to have one abnormal BeLPT and one borderline BeLPT, or determined to have three borderline BeLPTs. responsible contractor. The contractor who directly employs (or in the case of independent contractors, has direct privity of contract with) beryllium-associated workers. For the purposes of this Subcontract, the Subcontractor is the “responsible contractor.” Rule. Refers to 10 CFR, Part 850, Chronic Beryllium Disease Prevention Program. sensitized workers. Beryllium-associated workers who have been tested and determined to have two abnormal BeLPTs. Lawrence Livermore National Laboratory Beryllium Exposure Prevention LLNL Facilities Master Specification (rev. 8 June 2024) Section 01 35 23.25 - Page 1 UNCONTROLLED UNCLASSIFIED INFORMATION DocuSign Envelope ID: 269A6DB7-7944-42BC-BBEA-131DAD73AA51 LLNL-MI-2000182 PMO.DT-ST-02 MD. The Subcontractor’s medical director. 1.5 LLNS RESPONSIBILITIES 1.5.1 Comply with requirements of the Rule, except for those specifically set forth below as “Subcontractor Responsibilities.” 1.5.2 Provide the Subcontractor with relevant information that is reasonably needed by the Subcontractor and its medical director (MD) to establish and maintain the List. 1.5.3 Develop and provide the Subcontractor with LLNS Chronic Beryllium Disease Prevention Program (CBDPP) in electronic format. 1.6 SUBCONTRACTOR RESPONSIBILITIES 1.6.1 The Subcontractor, as the responsible contractor for the purposes of compliance with the Rule, is responsible for the following actions. 1.6.2 Comply with the current version of the LLNS CBDPP. 1.6.3 Respiratory Protection: Ensure that respiratory protection, when specified by LLNS on the basis of the hazard assessment, is provided to all beryllium-associated workers commensurate with the Subcontractor’s respiratory protection program. 1.6.4 Medical Surveillance: Develop and implement a medical surveillance program for beryllium- associated workers who voluntarily participate in the program as required under 10 CFR 850.34. (a) List: Establish and maintain during the term of the Subcontract a list of beryllium-associated workers that meets the requirements set forth in 10 CFR 850.34(a)(4). (b) Medical Evaluations: The Subcontractor is solely responsible for determining how it will comply with these requirements for its medical surveillance program. Provide one or more of the following to each beryllium-associated worker who voluntarily participates in the program: (1) The medical evaluations described in 10 CFR 850.34(b). (2) Multiple physician review process described in 10 CFR 850.34(c). (3) The alternative physician determination as described in 10 CFR 850.34(d). (c) Medical Consent: Provide each beryllium-associated worker who voluntarily participates in the program the medical consent information required under 10 CFR 850.36. (d) Subcontractor Medical Director: Retain and supervise a qualified MD. (1) Make information required under the Rule available to the MD, including, but not limited to, the information required under 10 CFR 850.34(a)(5) and 10 CFR 850.34(a)(6), and follow the recommendations of the MD as otherwise required under the Rule. (2) The MD is responsible for the overall administration of the Subcontractor's medical surveillance program and taking such actions as are reasonably required to comply with the Rule including, but not limited to, the following: (A) Ensuring that the medical evaluations and procedures required under the Rule are performed by, or under the supervision of, a licensed physician who is familiar with the health effects of beryllium, as required under 10 CFR 850.34(a)(3); (B) Complying with 10 CFR 850.34(c)(6); (C) Complying with 10 CFR 850.34(e); Lawrence Livermore National Laboratory Beryllium Exposure Prevention LLNL Facilities Master Specification (rev. 8 June 2024) Section 01 35 23.25 - Page 2 UNCONTROLLED UNCLASSIFIED INFORMATION DocuSign Envelope ID: 269A6DB7-7944-42BC-BBEA-131DAD73AA51 LLNL-MI-2000182 PMO.DT-ST-02 (D) Obtaining the signatures required under 10 CFR 850.36(c); and (E) Making the determinations regarding medical removal as provided in 10 CFR 850.35 including, but not limited to, the worker consultation required under 10 CFR 850.35(a)(3). The MD must also prepare and submit semi-annual registry information according to DOE guidelines contained in DOE-STD-1187. (3) At least five working days before work is scheduled to begin, provide the LLNS contract analyst with the name, address, telephone number, and the curriculum vitae of the MD responsible for administering the medical surveillance program. (e) Medical Removal. Comply with applicable procedures, consultations, and disclosures as required by 10 CFR 850.35 and as follows: (1) Provide medically removed beryllium-associated workers with the protection benefits required under 10 CFR 850.35(b), subject to an equitable adjustment to the Subcontract price. (2) Recommend temporary or permanent removal of beryllium-affected workers. (3) Immediately notify LLNS (attention LLNS HSD) of workers recommended for temporary or permanent medical removal. (4) Provide a de-identified occupational questionnaire to worker(s) recommended for removal. The worker(s) must complete the questionnaire in its entirety. Submit the completed questionnaire(s) to LLNS (attention LLNS HSD). 1.6.5 Training and Counseling: Consistent with 10 CFR 850.37, ensure that each applicable worker completes beryllium training and counseling courses. The Subcontract specifies the training and counseling requirements, which may be updated and revised from time to time. (a) Ensure compliance with 10 CFR 850.37(d) and 10 CFR 850.37(e) by continuously monitoring situations affecting its workers and the knowledge and expertise of the Subcontractor’s workforce. (b) When and if additional training is required per 10 CFR 850.37(e), promptly notify LLNSS in writing, coordinate the appropriate training courses applicable to the circumstances, and take all reasonable steps necessary to protect worker general health, safety, and well-being. (c) Provide counseling related to beryllium-affected workers consistent with 10 CFR 850.37(f). 1.6.6 Recordkeeping: Comply with applicable record keeping requirements under 10 CFR 850.39. Submit DOE required data, to the Beryllium Registry Data Center at Oak Ridge Institute for Science and Education, per DOE-STD-1187. This includes medical surveillance and personal exposure monitoring data (if collected). In addition to the DOE submission, at a minimum, provide the following to LLNS: (a) Beryllium-associated Workers List: Within 180 days of beginning work, develop a list of beryllium-associated workers (“beryllium-associated workers list”) who may be eligible for protective measures in compliance with 10 CFR 850.36 and submit list to LLNS (to the attention of LLNS HSD). Follow requirements of 10 CFR 850.34(a)(4). Thereafter, provide updated versions of the beryllium-associated workers list to LLNS (to the attention of LLNS HSD) every 180 days until the expiration (or termination) of the Subcontract. Lawrence Livermore National Laboratory Beryllium Exposure Prevention LLNL Facilities Master Specification (rev. 8 June 2024) Section 01 35 23.25 - Page 3 UNCONTROLLED UNCLASSIFIED INFORMATION DocuSign Envelope ID: 269A6DB7-7944-42BC-BBEA-131DAD73AA51 LLNL-MI-2000182 PMO.DT-ST-02 (b) Medical Surveillance Information, if permission is provided by the employee: The worker or their designated physician is primarily responsible for maintaining the employee’s medical surveillance information, unless the employee consents to providing this information to the LLNS HSD, who will maintain such records for up to 75 years. 1.6.7 Performance Feedback: As the responsible contractor, comply with applicable performance feedback requirements under 10 CFR 850.40, such as communicating feedback in a timely manner to interested stakeholders. (a) Lower-Tier Subcontractors: To the extent that an employee or independent contractor of a lower-tier subcontractor qualifies as a beryllium-associated worker, the Subcontractor is deemed the responsible contractor for such workers and is responsible for ensuring compliance with the Rule. (b) Pre-Start Submittals: Provide the following submittals if respiratory protection is required by the LLNS hazard assessment. (1) Subcontractor’s respiratory protection program. (2) Record of successful respirator fit testing and training performed by a qualified individual within the previous 12 months for each worker required to use a respirator for this project. Record must include each worker’s name. (3) A written medical evaluation performed by a physician or other licensed health care professional with a determination that the worker is medically able to use the specified respirator(s). PART 2 PRODUCTS – NOT USED PART 3 EXECUTION – NOT USED END OF SECTION 01 35 23.25 Lawrence Livermore National Laboratory Beryllium Exposure Prevention LLNL Facilities Master Specification (rev. 8 June 2024) Section 01 35 23.25 - Page 4 UNCONTROLLED UNCLASSIFIED INFORMATION DocuSign Envelope ID: 269A6DB7-7944-42BC-BBEA-131DAD73AA51 LLNL-MI-2000182 PMO.DT-ST-02 SECTION 01 35 43 ENVIRONMENTAL PROTECTION PART 1 GENERAL 1.1 SECTION INCLUDES 1.1.1 Environmental Management System. 1.1.2 Storm water pollution prevention. 1.1.3 Air Emissions. 1.1.4 Material and waste discharges. 1.1.5 Protection of cultural or paleontological resources. 1.1.6 Protection of biological resources. 1.1.7 Conservation of energy and water. 1.1.8 Lead and asbestos exposure. 1.1.9 Imported fill material. 1.1.10 Disposal of excess soil, asphalt, concrete and other materials. 1.1.11 Subcontractor use and management of nonhazardous and hazardous waste. 1.1.12 Controlled items and materials. 1.2 RELATED REQUIREMENTS 1.2.1 01 35 23.13 - Asbestos Safety: Class I and II. 1.2.2 01 35 23.19 - Asbestos Safety: Class III, IV, and Unclassified. 1.2.3 01 35 23.21 - Lead Work Exposure Protection. 1.3 DEFINITIONS dust nuisance. Airborne particulate matter in sufficient quantity to obscure an observer’s view by more than 20 percent for more than 3 minutes in any 1 hour. 1.4 REFERENCES 1.4.1 13 CCR 2025 - Regulation to Reduce Emissions of Diesel Particulate Matter, Oxides of Nitrogen and Other Criteria Pollutants, from In-Use Heavy-Duty Diesel-Fueled Vehicles; current edition. 1.4.2 13 CCR 2449 - 2449.2 - In-Use Off-Road Diesel-Fueled Fleets; current edition. 1.4.3 13 CCR 2775 - 2775.2 - Large Spark-Ignition (LSI) Engine Fleet Requirements; current edition. 1.4.4 17 CCR §94507-94517 - Consumer Products; current edition. 1.4.5 17 CCR §95371-95379 - California Code of Regulations, Title 17, Division 3, Chapter 1, Subchapter 10 Climate Change, Article 4, Sub Article 5 - Prohibitions on Use of Certain Hydrofluorocarbons in Stationary Refrigeration, Chillers, Aerosols—Propellants, and Foam End-Uses; current edition. 1.4.6 17 CCR 95380 - 95398 - Management of High Global Warming Potential Refrigerants for Stationary Sources; current edition. 1.4.7 40 CFR 82 - Protection of Stratospheric Ozone; current edition. Lawrence Livermore National Laboratory Environmental Protection LLNL Facilities Master Specification (rev. 8 June 2024) Section 01 35 43 - Page 1 UNCONTROLLED UNCLASSIFIED INFORMATION DocuSign Envelope ID: 269A6DB7-7944-42BC-BBEA-131DAD73AA51 LLNL-MI-2000182 PMO.DT-ST-02 1.4.8 40 CFR 112 - Oil Pollution Prevention; 2022. 1.4.9 42 USC Ch. 85 - Air Pollution Prevention and Control; current edition. 1.4.10 BAAQMD regulation 9, rule 6 - Nitrogen Oxides Emissions from Natural Gas-Fired Boilers and Water Heaters; Current Edition. 1.4.11 BAAQMD regulation 9, rule 7 - Nitrogen Oxides And Carbon Monoxide from Industrial, Institutional, and Commercial Boilers, Steam Generators, And Process Heaters; Current Edition. 1.4.12 Clean Air Act - 42 USC Ch. 85 - Air Pollution Prevention and Control; current edition. 1.4.13 SJVAPCD regulation IV, rule 4306 - Boilers, Steam Generators, and Process Heaters – Phase 3; current edition. 1.4.14 SJVAPCD regulation IV, rule 4307 - Boilers, Steam Generators, and Process Heaters – 2.0 MMBTU/HR to 5.0 MMBTU/HR; current edition. 1.4.15 SJVAPCD regulation IV, rule 4308 - Boilers, Steam Generators, and Process Heaters – 0.075 MMBTU/HR to 2.0 MMBTU/HR; current edition. 1.4.16 SJVAPCD regulation IV, rule 4320 - Advanced Emission Reduction Options for Boilers, Steam Generators, and Process Heaters Greater Than 5.0 MMBTU/HR; current edition. 1.5 SUBMITTALS 1.5.1 Storm Water Pollution Prevention Plan (SWPPP). Include a site restoration plan designed to achieve final stabilization as defined by the Construction General Permit, section II.D. 1.5.2 Solid Waste Management Plan (SWMP). Use the attached form (attachment 01 35 43-2). Include the nonhazardous construction and demolition solid waste components (e.g., wood, non-friable asbestos, metals by type), estimated waste amounts for each waste component, and their proposed disposition (i.e., solid waste disposal or recycling). 1.5.3 Waste Records (a) Submit final, actual disposal amounts at project completion. (b) Submit disposal and recycling receipts at project completion. 1.5.4 Hazardous Material Inventory form (attachment 01 35 43-3). 1.5.5 Refrigerant Records (a) EPA certification cards for technicians performing work handling refrigerants. (b) Refrigerant recovery equipment certification, make, model, and serial number. (c) Maintenance, service, repair and disposal records: location and identification of the refrigeration equipment; maintenance, service, repair or disposal date; parts of the refrigeration equipment being maintained, serviced, repaired or disposed; type of maintenance, service, repair or disposal for each part; names of the persons performing the maintenance, service, repair or disposal; and the type and amount of refrigerant added to or removed from the equipment. Use attachment 01 35 43-4. (d) Leak inspections records: Inspection date, inspection methods, location of each identified leak, and a certification that all visible and accessible parts of the refrigeration equipment were inspected. Use attachment 01 35 43-4. Lawrence Livermore National Laboratory Environmental Protection LLNL Facilities Master Specification (rev. 8 June 2024) Section 01 35 43 - Page 2 UNCONTROLLED UNCLASSIFIED INFORMATION DocuSign Envelope ID: 269A6DB7-7944-42BC-BBEA-131DAD73AA51 LLNL-MI-2000182 PMO.DT-ST-02 (e) Initial and follow-up verification test records: Refrigeration equipment location and identification, test dates, locations of all repaired leaks that were tested, types of verification tests used and the results of the tests. Use attachment 01 35 43-4. (f) Disposal Records: make, model, serial numbers of equipment, and date of disposal, certified technician’s name and company, certification number (redact social security numbers) and certification type (I, II, III or Universal), refrigerant type, quantity recovered (lbs.), and date recovered. Use attachment 01 35 43-5. (g) Refrigerant reclamation/destruction records, type and quantity of refrigerants transferred for reclamation/destruction, who it was transferred to, date of transfer, and facility proof of certification. 1.5.6 Building Flush Plan. Include, at a minimum, a description of the process, an estimate for the quantity of wastewater generated, and the Safety Data Sheets (SDS) for the chemicals used. 1.5.7 Portable Engine/Equipment Operation Log (see attachment01 35 43-6). 1.6 QUALITY ASSURANCE 1.6.1 SWPPPs must be prepared by qualified SWPPP developers as defined in the permit. PART 2 PRODUCTS - NOT USED PART 3 EXECUTION 3.1 ENVIRONMENTAL MANAGEMENT SYSTEM 3.1.1 Perform the work in a manner that supports Lawrence Livermore National Security’s, LLC (LLNS’) commitment to be a responsible steward of the environmental resources under its control and the implementation of the LLNS’ Environmental Management System (EMS) by incorporating the following actions into planning and conducting the work: (a) Protect the air, water, land, and other natural and cultural resources. (b) Comply with applicable environmental requirements. (c) Prevent pollution, minimize waste, and conserve resources. 3.2 STORM WATER POLLUTION PREVENTION Note: This article is not applicable if there is no outdoor work, including equipment, materials, and chemical staging, or land disturbance (such as trenching or grading). 3.2.1 Comply with California State Water Resources Control Board “Industrial General Storm Water Permit” (IGP) (2014-0057-DWQ) when performing work in the following areas: the decontamination and waste treatment facility (DWTF) and the B612/625 complex at the Livermore Site; and B883, B845B, and the explosive waste storage facility at Site 300. Copies of LLNS’ “Industrial Activities SWPPP” for the Livermore Site and Site 300, and the current IGP are available for Subcontractor review upon request. 3.2.2 If the project involves land disturbance of less than one acre (including staging areas), or the project has potential for storm water impact, then the Subcontractor is responsible for the following: Lawrence Livermore National Laboratory Environmental Protection LLNL Facilities Master Specification (rev. 8 June 2024) Section 01 35 43 - Page 3 UNCONTROLLED UNCLASSIFIED INFORMATION DocuSign Envelope ID: 269A6DB7-7944-42BC-BBEA-131DAD73AA51 LLNL-MI-2000182 PMO.DT-ST-02 (a) Maintain continual storm water pollution prevention and perform work to avoid discharge of pollutants into the storm drainage system. Failure to comply may result in LLNS stopping work until the Subcontractor performs remedial action. Refer to attachment 01 35 43-1 for applicable best management practices (BMPs). (b) The Subcontractor may propose alternate pollution prevention measures for those identified in the contract erosion control documents and attachment 01 35 43-1. (1) Submit alternate pollution prevention measures for LLNS review. (2) LLNS acceptance of alternate pollution prevention measures does not relieve the Subcontractor of responsibility for the quality and adequacy of the measures or Subcontractor implementation of them. Such acceptance does not warrant, acknowledge, or admit the quality and adequacy of the alternate pollution prevention measures. (c) Provide materials and labor required to implement and maintain pollution prevention measures. (d) If pollution is leaving the project site, implement necessary corrective measures. Failure to comply with the requirements of the SWPPP may result in criminal and civil liability of the Subcontractor under the Clean Water Act. (e) If storm water accumulates in a trench or other excavation within a known contamination source area, the water will be characterized by LLNS (in-situ or in a container) for known contaminants of concern prior to dewatering the excavation. Contact the LLNS Subcontract Technical Representative (STR) for assistance. (f) If storm water accumulates in a trench or other excavation outside of a known contamination source area, visually inspect the water for an oily sheen or other material. If no sheen is visible and water is clear, it may be released to the closest sanitary waste system or to ground. (1) Do not discharge water into storm drains. If a sheen or other material e.g., sludge, solids, color change is present, the water will be characterized by LLNS (in-situ or in a container) prior to dewatering the excavation. (2) Contact the STR for assistance. 3.2.3 If the project involves land disturbance equal to or greater than one acre (including staging areas), then the following paragraphs apply [Storm Water Pollution Prevention Plan (SWPPP)]. (a) Develop a SWPPP covering the construction site for construction phases, including laydown areas, unpaved access roads, and borrow sites in accordance with requirements of the State of California “Construction General Permit” (order 2022-0057-DWQ). (b) Pay fees associated with coverage under the Construction General Permit directly to the State of California. (c) Provide documentation of the Construction General Permit required training and certifications for “Qualified SWPPP Developers and Qualified SWPP Practitioners,” and qualifications for Subcontractor personnel that write the SWPPP, implement the BMPs, and perform inspections. (d) Keep a SWPPP binder on-site and available for review during working hours. Submit stormwater monitoring data to the STR within two days following a storm event. Lawrence Livermore National Laboratory Environmental Protection LLNL Facilities Master Specification (rev. 8 June 2024) Section 01 35 43 - Page 4 UNCONTROLLED UNCLASSIFIED INFORMATION DocuSign Envelope ID: 269A6DB7-7944-42BC-BBEA-131DAD73AA51 LLNL-MI-2000182 PMO.DT-ST-02 (e) Submit the SWPPP in accordance with 01 33 00 - Submittal Procedures for LLNS review and acceptance. Conform to the plan’s provisions once it is accepted by LLNS. Failure to comply may result in LLNS halting work until the Subcontractor takes remedial action. (f) LLNS acceptance of the Subcontractor’s SWPPP does not relieve the Subcontractor of responsibility for the quality and adequacy of the SWPPP or Rain Event Action Plan (REAP). LLNS acceptance does not warrant, acknowledge, or admit the quality and adequacy of the SWPPP. (g) Do not start construction activity until LLNS accepts the Subcontractor’s SWPPP, a Notice of Intent has been submitted to the State, and the State assigns a discharge identification number. (h) Provide materials and labor (including the qualified SWPPP practitioners and storm water sampling personnel) as required to implement and maintain the SWPPP, pollution prevention measures, and inspections until acceptance of the notice of termination (NOT) by the regional water quality control board. (i) Do not use erosion control rolls, mats, or other similar materials containing monofilament, thin plastic thread, or plastic netting. Certain tightly woven (without gaps) plastic materials, such as SiltSoxx, are allowed if approved by the LLNS wildlife biologist. Silt fencing may not be use at Site 300 unless approved by the LLNS wildlife biologist. Contact the STR for assistance. (j) Prepare the notice of intent (NOI), annual report, ad hoc reports, NOT, and other permit registration documents in order for work to be covered by the Construction General Permit. (1) Complete the NOT within 90 days of achieving final stabilization. (2) Upload documents to the Storm Water Multiple Application and Report Tracking System (SMARTS). (3) Promptly notify LLNS of ad hoc reports and numeric action limit (NAL) exceedance to accommodate the 10 day SMARTS certification requirement. (k) LLNS Responsibilities (1) LLNS will link the Subcontractor as a data submitter in SMARTS. LLNS will notify the LRP when permit registration documents are ready for certification. (2) LLNS reserves the right to inspect the site at any time. Failure to comply may result in LLNS halting work until the Subcontractor performs remedial action, which may include modifications to BMP implementation and methods used. In addition, failure to comply with the requirements of the SWPPP may result in criminal and civil liability of the Subcontractor under the Clean Water Act. (3) LLNS may accept erosivity waivers for projects that fall within the Environmental Protection Agency’s (EPA’s) Small Construction Rainfall Erosivity Waiver. Application and processing of the waiver through SMARTS is the responsibility of the Subcontractor. A waiver does not relieve the Subcontractor of the requirements of article 3.2.2. 3.3 AIR EMISSIONS 3.3.1 Dust Control Lawrence Livermore National Laboratory Environmental Protection LLNL Facilities Master Specification (rev. 8 June 2024) Section 01 35 43 - Page 5 UNCONTROLLED UNCLASSIFIED INFORMATION DocuSign Envelope ID: 269A6DB7-7944-42BC-BBEA-131DAD73AA51 LLNL-MI-2000182 PMO.DT-ST-02 (a) Perform dust control to alleviate and prevent dust nuisance at, or near, the construction site as it pertains to the Subcontract work. (b) Use the following methods of dust control when disturbing soil: (1) Spray water on loose soil that may become airborne. (2) Cover stockpiled excavated material containing soil to prevent wind and water erosion and dispersal during storage. (3) Prevent dust suppression water from entering storm drains. 3.3.2 Equipment Emissions (a) Internal Combustion Engines (1) Comply with applicable Bay Area Air Quality Management District (BAAQMD), San Joaquin Valley Air Pollution Control District (SJVAPCD), or California Air Resources Board (CARB) requirements for stationary or portable equipment (e.g., generator, air compressors, lifts) with internal combustion engine's maximum brake horsepower rating (bhp): (A) Greater than 50 bhp - stationary equipment. (B) At 50 bhp and greater - portable equipment. (2) For each portable equipment/engine subject to this section, within 30 days of the end of each calendar year and within 10 days of project close-out, provide the STR with the following records for each piece of portable equipment/engine (using attachment 01 35 43-6): (A) Equipment type (e.g., generator, air compressor, lift). (B) Equipment make and model. (C) Internal combustion engine fuel type (e.g., diesel, gasoline, propane). (D) Internal combustion make and model. (E) Internal combustion engine maximum brake horsepower rating. (F) Internal combustion engine Environmental Protection Agency (EPA) family identification number. (G) Internal combustion engine emission factors. (H) Total number of hours equipment/engine operated at LLNL on a calendar year basis. (b) Boilers and Water Heaters: Ensure boilers and water heaters used, procured, and/or installed comply with applicable BAAQMD, SJVAPCD, CARB, and/or EPA rules and regulations, including but not limited to: (1) BAAQMD regulation 9, rule 6 (Nitrogen Oxides Emissions from Natural Gas-Fired Boilers and Water Heaters) emission limits and certification requirements. (2) BAAQMD regulation 9, rule 7 (Nitrogen Oxides and Carbon Monoxide from Industrial, Institutional, and Commercial Boilers, Steam Generators, and Process Heaters) emission limits, certification, stack gas temperature limits, insulation, and periodic testing requirements. Lawrence Livermore National Laboratory Environmental Protection LLNL Facilities Master Specification (rev. 8 June 2024) Section 01 35 43 - Page 6 UNCONTROLLED UNCLASSIFIED INFORMATION DocuSign Envelope ID: 269A6DB7-7944-42BC-BBEA-131DAD73AA51 LLNL-MI-2000182 PMO.DT-ST-02 (3) SJVAPCD regulation IV, rule 4306 (Boilers, Steam Generators, and Process Heaters – Phase 3), SJVAPCD regulation IV, rule 4307 (Boilers, Steam Generators, and Process Heaters – 2.0 MMBTU/HR to 5.0 MMBTU/HR), SJVAPCD regulation IV, rule 4308 (Boilers, Steam Generators, and Process Heaters – 0.075 MMBTU/HR to 2.0 MMBTU/HR), and SJVAPCD regulation IV, rule 4320 (Advanced Emission Reduction Options for Boilers, Steam Generators, and Process Heaters Greater Than 5.0 MMBTU/HR). (c) Other Equipment that Emits Air Pollutants: Ensure air pollutant emitting equipment used, procured, and/or installed comply with applicable BAAQMD, SJVAPCD, CARB, and/or EPA rules and regulations. (d) Ensure products, equipment, and work comply with BAAQMD or SJVAPCD regulations and the air permits issued for the LLNL facility. Request a list of applicable air permits from the STR. Supply required information. (e) Equipment Containing Refrigerants: Perform installation, maintenance, service, repair, or disposal of equipment containing refrigerants in accordance with 40 CFR 82, subpart F and 17 CCR 95380 - 95398 as applicable to the work. (1) Technician Certification. Subcontractors installing, maintaining, servicing, repairing, or disposing of equipment containing refrigerants, where the integrity of the refrigerant circuit could be violated, must be certified in accordance with 40 CFR 82, subpart F. (2) Subcontractors repairing leaks to equipment subject to the 17 CCR 95380 - 95398 requirements must hold a current and active California contractor’s license in the C38 – Refrigeration Contractor licensing classification. (3) Recovery and Recycling Equipment Certification. Equipment used for refrigerant recovery or recycling must be certified in accordance with 40 CFR Part 82 Subpart F. (4) Good Service Practices. Subcontractor must adhere to the following: (A) Do not Intentionally vent refrigerants; this practice is prohibited. (B) Inspect for and repair equipment leaks prior to adding refrigerant. (C) Evacuate refrigerants to the required vacuum level specified in 40 CFR 82, subpart F prior to opening equipment for repair. (5) Leak Repair on Equipment with Full Charge Capacity of 50 or More Pounds of Refrigerant: (A) Perform a complete leak inspection on the entire accessible portion of the equipment. Identify all leak locations. (B) Evacuate refrigerant to the required vacuum level prior to opening equipment for repair. Record the refrigerant type, quantity and date refrigerant was recovered. (C) Make repairs. (D) Perform an initial verification test demonstrating the leak repair attempts were successful, before adding refrigerant back into the equipment. (E) Add refrigerant into equipment. Record the refrigerant type, quantity and date refrigerant was added. Lawrence Livermore National Laboratory Environmental Protection LLNL Facilities Master Specification (rev. 8 June 2024) Section 01 35 43 - Page 7 UNCONTROLLED UNCLASSIFIED INFORMATION DocuSign Envelope ID: 269A6DB7-7944-42BC-BBEA-131DAD73AA51 LLNL-MI-2000182 PMO.DT-ST-02 (F) Perform a follow-up verification test demonstrating the leak repair attempts were successful within 10 days of the successful initial verification test or 10 days of the appliance reaching normal operating conditions. (6) Disposing of Equipment Containing Refrigerants: (A) Recover refrigerant from equipment to be disposed of with a full charge capacity of more than 5 pounds prior to sending the equipment to DUS or prior to removing equipment from the Site. (B) Do not recover refrigerant from small appliances to be disposed of that are hermetically sealed with a full charge capacity of 5 or less pounds and if the equipment will be sent to LLNL Donation, Utilization, and Sales (DUS). (C) Recover refrigerant from small appliances to be disposed of by the Subcontractor (taken with the Subcontractor and not sent to DUS) prior to final disposal. (D) Check with the STR to determine if recovered refrigerant is to be returned to LLNS for storage or if it is to be transferred offsite to a refrigerant consolidator, a USEPA certified reclaimer, or a destruction facility. (E) If reclaiming refrigerant, use a U.S. EPA-certified reclaimer. (F) If destroying refrigerant, use a U.S. EPA-certified or U.S. EPA-recognized commercially available ozone depleting substance destruction facility. (f) Vehicles (1) Comply with applicable CARB vehicle regulations. Relevant examples include the following: (A) Large-spark ignition engine fleet requirements (aka CARB LSI regulation) in13 CCR 2775 - 2775.2. (B) Regulation for In-Use Off-Road Diesel-Fueled Fleets (also known as the CARB off- road diesel regulation) in 13 CCR 2449 - 2449.2. (C) Regulation to Reduce Emissions of Diesel Particulate Matter, Oxides of Nitrogen and Other Criteria Pollutants from In-Use Heavy-Duty Diesel-Fueled Vehicles (aka the CARB truck and bus regulation) in 13 CCR 2025. (2) Comply with the following: (A) Required vehicle/equipment labeling. (B) LLNL idling policy. (C) If operating vehicle(s) subject to the CARB fleet regulation on LLNL property, provide the STR with a copy of the associated compliance certificate, or a written affirmation of fleet-wide compliance for the fleet dispatching the vehicles issued by CARB, or a written statement from the vehicle owner that verifies that their on-road heavy duty diesel vehicle fleet complies with all CARB vehicle regulations. (g) Asbestos: Ensure that a 10-day BAAQMD or SJVAPCD notification is submitted prior to the following: (1) Demolition activities regardless of whether asbestos is present. Lawrence Livermore National Laboratory Environmental Protection LLNL Facilities Master Specification (rev. 8 June 2024) Section 01 35 43 - Page 8 UNCONTROLLED UNCLASSIFIED INFORMATION DocuSign Envelope ID: 269A6DB7-7944-42BC-BBEA-131DAD73AA51 LLNL-MI-2000182 PMO.DT-ST-02 (2) Renovation activities involving the stripping or disturbance of regulated asbestos containing material (RACM) equal to or greater than: (A) Livermore Site (BAAQMD): 100 linear ft.,100 square ft., or 35 cubic ft. (B) Site 300 (SJVAPCD): 260 linear ft., 160 square ft., or 35 cubic ft. 3.3.3 Ensure that new, modified, or retrofitted equipment or products containing or manufactured with HFCs, purchased, installed, or used, comply with the following: (a) 17 CCR §95371-95379, Prohibition on Use of Certain Hydrofluorocarbons in Stationary Refrigeration, Stationary Air-conditioning, and Other End-Uses. (b) U.S. EPA Significant New Alternatives Policy (Clean Air Act, Section 612). 3.4 MATERIAL AND WASTE DISCHARGES 3.4.1 Do not discharge hazardous materials or wastes into the environment (i.e., air, soil, surface water, and groundwater). (a) Protect routes of entry to the environment, including direct discharges into air, soil, surface water, storm sewer, sanitary sewer, wells, and drainage channels from construction activities. (b) Achieve this through the safe and proper use and storage of tools, equipment, and materials. (c) Inspect construction equipment and vehicles daily for leaks of fuel, engine coolant, and hydraulic fluid. (d) Contain, repair, and immediately report leaks to the STR. (e) Stop work and immediately report accidental discharges into the environment to the STR. (f) Clean up discharges into the environment according to the guidance provided by STR. 3.4.2 Discharges to Sanitary Sewer: Do not discharge hazardous chemicals into the retention or sanitary system. (a) Supply a building flush plan prior to the installation of new piping that will require chemical treatment. (b) Obtain approval from the STR prior to discharging into the sanitary sewer system. (c) Refer to the Waste Discharge Authorization Record (WDAR) process flow chart in attachment 01 35 43-7 for more information on the management of wastewater at LLNL. 3.4.3 Discharges to Ground (a) Collect unused concrete in drums or lined containers. Remove excess concrete for proper disposal off-site and report the total quantity disposed of or recycled to the STR. (b) Collect construction and demolition debris to be recycled in appropriate roll-off bins, DUS scrap metal bins, or other containers for evaluation. (c) Discharge wash water from cleaning concrete trucks and concrete handling equipment in drums or lined containers and properly dispose off-site. Discharge wash and rinse water from pressure washing buildings as follows: (1) Collect and manage hazardous materials (e.g., lead-based paint chips) as hazardous waste. Lawrence Livermore National Laboratory Environmental Protection LLNL Facilities Master Specification (rev. 8 June 2024) Section 01 35 43 - Page 9 UNCONTROLLED UNCLASSIFIED INFORMATION DocuSign Envelope ID: 269A6DB7-7944-42BC-BBEA-131DAD73AA51 LLNL-MI-2000182 PMO.DT-ST-02 (2) Collect wash water containing soap and discharge it to the sanitary sewer. Contact STR for guidance. (3) Collect, characterize, and dispose of properly, wastewater resulting from washing hazardous residue or areas contaminated with hazardous materials. Contact STR for guidance. (4) Discharge uncontaminated rinse water from pressure washing roofs through a filter system such as hay rolls or a filter bag. Contact STR for guidance. (5) Do not discharge wash and rinse water into a storm drain, drainage channel, or other bodies of water. (d) Comply with Spill Prevention, Control, and Countermeasure (SPCC) requirements in 40 CFR 112, including, but not limited to the following: (1) Store oil and petroleum tanks/containers (e.g., diesel, gasoline, dielectric oil, mineral oil, motor oil, oil-based coolants, used oil, food oil, and oily wastewater) 55 gallons and larger in double-walled tanks/containers or in secondary containment sized to contain the largest container plus freeboard sufficient to accommodate a 24-hour 25-year storm if exposed to the elements. (2) Periodically inspect all regulated bulk storage containers, portable bulk storage containers, electrical equipment and operating equipment that contain or are capable of containing 55 gallons or more of oil. (3) Maintain appropriate spill response materials (e.g., spill kits, written spill response and notification protocols) to prevent and contain leaks from equipment (e.g., drip pans). (4) Comply with and implement ​LLNS​’s site-wide SPCC plan. Personnel responsible for operating, maintaining, or inspecting aboveground oil-filled containers or equipment that contain or are capable of containing 55 gallons or more of oil are required to receive SPCC training from ​LLNS​. The aforementioned personnel are also required to take an annual training refresher provided by ​LLNS​. (5) Provide reports of required SPCC inspections to the STR at a regular frequency. Notify the STR immediately if a spill or leak has occurred. (6) Provide documentation of the material being stored and volume of oil for any oil oil-filled containers or equipment that contain or are capable of containing 55 gallons or more of oil. (7) Notify the STR if oil-filled containers or equipment that contain or are capable of containing 55 gallons or more of oil will remain at the facility for 6 months or longer. 3.5 PROTECTION OF CULTURAL OR PALEONTOLOGICAL RESOURCES 3.5.1 LLNS will clearly mark known cultural or paleontological resource areas within construction zones by staking, fencing, and pink/black diagonally striped flagging. Avoid these areas during construction. 3.5.2 If cultural or paleontological resources are unearthed during construction activities, immediately stop work within 50 feet of the find until LLNS has assessed it and issued notice to proceed. (a) Examples of cultural resources include the following: Lawrence Livermore National Laboratory Environmental Protection LLNL Facilities Master Specification (rev. 8 June 2024) Section 01 35 43 - Page 10 UNCONTROLLED UNCLASSIFIED INFORMATION DocuSign Envelope ID: 269A6DB7-7944-42BC-BBEA-131DAD73AA51 LLNL-MI-2000182 PMO.DT-ST-02 (1) Prehistoric cultural deposits such as obsidian or chert flakes or tools; ground-stone mortars, slabs, or pestles; cultural deposits of shell or bone; beads, clothing, or woven articles; locally darkened midden (trash) soils; and human interments. (2) Historic-period cultural materials, such as foundations or other structural remains; bottles, nails, barbed wire, ceramic pieces, buttons, weathered boards, and tin cans; refuse deposits; backfilled wells or privies; glass and pottery. (b) Examples of paleontological resources include fossils and bones that are not of human origin. 3.5.3 The Archaeological Resources Protection Act (ARPA) and the Antiquities Act regulate the protection and excavation of cultural and paleontological resources. Do not, under any circumstances, remove or disturb such resources. If discovered, leave in place, note their location, and immediately notify the STR. 3.6 PROTECTION OF BIOLOGICAL RESOURCES 3.6.1 Species listed as endangered, threatened, or proposed or candidates for listing under the federal Endangered Species Act (ESA) and/or California Endangered Species Act (CESA) occur at Site 300, the Livermore Site, and the Arroyo Mocho Site. Several other species occur at these LLNL sites that may receive protection under other federal and state regulations including the Migratory Bird Treaty Act (MBTA). Numerous federal and state laws outline the protection, management requirements, and penalties for noncompliance. Site-specific and project-specific requirements may apply that include, but are not limited to, pre-activity surveys, exclusion zones, and exclusion fencing. See the Project Requirements Document for project specific avoidance and minimization measures required by Biological Opinions with the U.S. Fish and Wildlife Service. Contact the STR for a determination. 3.6.2 All personnel conducting outdoor work at Site 300, the Livermore Site or the Arroyo Mocho Pumping Station must be current in EP0030 (LLNL Natural Resources Compliance and Safety). EP0026 (Livermore Site Natural Resources Compliance and Safety) may be substituted for EP0030 for individuals who will only work at the Livermore Site. If an LLNL natural resources training is required, then LLNS requires that laborers, craftsmen, supervisors, and foremen directly involved in the project to attend the above training. 3.6.3 Do not attempt to capture, relocate, or handle any wild or feral animal or remove nests. If wild or feral animals or nests are found in the work area, immediately cease work in that area, and contact the STR. 3.6.4 Do not feed or provide water for wild or feral animals at LLNL sites. 3.6.5 Do not bring or release animals to LLNL sites. 3.6.6 All staging, laydown and soil storage areas must be in previously disturbed areas approved by the LLNS wildlife biologist unless otherwise specified by LLNS. 3.6.7 Keep the project site clean and free of trash. Deposit food scraps, paper and aluminum wrappers, packaging, cans, bottles, and other food related and trash items in covered and closed trash containers that are not accessible by wildlife. Empty food trash bins at the end of each workday. 3.6.8 Open Excavations (outside or exterior of the building): Protect wildlife from entrapment in steep- walled excavations greater than 1 foot deep as follows: Lawrence Livermore National Laboratory Environmental Protection LLNL Facilities Master Specification (rev. 8 June 2024) Section 01 35 43 - Page 11 UNCONTROLLED UNCLASSIFIED INFORMATION DocuSign Envelope ID: 269A6DB7-7944-42BC-BBEA-131DAD73AA51 LLNL-MI-2000182 PMO.DT-ST-02 (a) Cover excavations completely at the end of each working day. Completely bury the edges of the cover (steel plate or plywood) to prevent wildlife access under the cover, or (b) Provide excavations with animal escape ramps constructed of earth fill or wooden planks (at least 6 inches wide). Earth ramps should be used whenever possible. Wooden planks or earthen ramps should at a 1:1 slope. (c) Before filling excavations, thoroughly inspect them for trapped animals. Contact the STR to obtain the assistance of a LLNS wildlife biologist to free trapped animals. (d) Backfill excavation as soon as possible and prior to the end of the project unless directed by LLNS. 3.6.9 Avoid impacts to nesting birds as described below: (a) The LLNS wildlife biologist will be contacted by the STR and given sufficient time to survey the affected area prior to initiation of project activities. (b) Projects that have the potential to impact nesting birds include but are not limited to the following: (1) Construction of new facilities and demolition of existing facilities. (2) Tree trimming or removal. (3) Power washing building exteriors or window washing. (4) HVAC work, roof replacement, or other exterior retrofit projects. (5) Work within or around arroyos, drainage ditches, waterways or other protected water features. (c) If nesting birds are found at the project site, exclusion zones and site-specific avoidance measures may be required. (d) If a nest is found in or near the work area, pause work and avoid the area and contact the STR. (e) Do not attempt to move or disturb any nest. (f) Impacts to nesting birds, and project delays due to nesting birds, can typically be avoided by scheduling the activities after August 30 and before February 15 of any given year. 3.6.10 Implement appropriate erosion control measures as identified by LLNS, such as native seeding and burlap straw waddles, jute netting, or SiltSoxx. Do not use materials containing plastic monofilament, nylon net, plastic net, or photodegradable netting at LLNL sites. Certain tightly woven (without gaps) plastic materials are allowed if approved by the LLNS wildlife biologist. Silt fencing may not be used at Site 300 unless approved by the LLNS wildlife biologist. Contact the STR for assistance with these exceptions. 3.6.11 Do not violate the exclusion zones or other areas demarcated by LLNS. Exclusion zones may be shown on a map or marked in the field with pink and black flagging or exclusion tape. 3.6.12 All construction pipes, culverts, or similar structures (greater than 6-inches in diameter) that are stored in the project area for one or more overnight periods must be securely capped prior to storage or thoroughly inspected for animals if the pipe is subsequently buried, capped, or otherwise used or moved in any way. Lawrence Livermore National Laboratory Environmental Protection LLNL Facilities Master Specification (rev. 8 June 2024) Section 01 35 43 - Page 12 UNCONTROLLED UNCLASSIFIED INFORMATION DocuSign Envelope ID: 269A6DB7-7944-42BC-BBEA-131DAD73AA51 LLNL-MI-2000182 PMO.DT-ST-02 3.6.13 Restrict exterior work at Site 300 involving construction, demolition, or ground disturbance to periods of low rainfall (less than 0.25-inch forecast during a 24-hour period and less than a 30 percent chance of rain forecast using the weather.gov forecast for the project site).1 3.6.14 Perform exterior work at Site 300 involving construction, demolition, or ground disturbance only during daylight hours, which is defined as after sunrise and before sunset.1 3.6.15 Wildlife Exclusionary Fencing (a) Install exclusionary fencing, if required by LLNS, to surround the project site prior to the start of work to preclude movement of wildlife into the project site. (b) When required, exclusion fencing must be installed prior to grading, excavation, construction, soil disturbance, or materials staging associated with this project. (c) Exclusion fencing must completely surround work areas. Include a gate that can be closed at the end of each workday, so that the project site is completely surrounded by exclusion fencing overnight. (d) The exclusion fencing must remain in place during outside work. (e) Use Ertec E-Fence, or equivalent, that is a minimum of 18 inches in height for the exclusion fencing. (f) Hold the exclusion fence in place at the base by sandbags or trenching at least 5 inches into the ground and backfilling on both sides of the fence. When trenching is not appropriate, hold the base of the fence down with sandbags, or other appropriate methods according to the manufacturer’s specifications, in a manner that eliminates gaps. (g) When exclusion fencing spanning more than 50 linear feet is used, install one-way exit funnels at the base of the exclusion fence every 25 feet per manufacturer’s specifications. (h) Follow the manufacturer’s specifications when installing and maintaining the exclusionary fencing. (i) Inspection by the LLNS wildlife biologist after exclusion fence installation is required. Contact the STR to request an inspection by the LLNS wildlife biologist. (j) Maintain exclusionary fencing throughout the duration of the project. (k) Perform weekly inspections of the exclusionary fencing associated with the project. (l) Repair holes, tears, gaps, or downed fence observed during the inspection as soon as possible. (m) Document the weekly inspections, and repairs that are performed. (n) Maintain records of the inspections onsite and make available to LLNS upon request. 3.7 CONSERVATION OF ENERGY AND WATER 3.7.1 To the maximum extent practicable, implement conservation practices that reduce the consumption of water and electricity. Reduction practices may include the following: (a) Turn off electric-powered items (e.g., tools, office equipment, lights) when not in use. (b) Use energy efficient products (i.e., Energy Star products or Federal Energy Management Program- [FEMP] designated products) unless the energy-consuming product is not listed in the Energy Star program or FEMP. Lawrence Livermore National Laboratory Environmental Protection LLNL Facilities Master Specification (rev. 8 June 2024) Section 01 35 43 - Page 13 UNCONTROLLED UNCLASSIFIED INFORMATION DocuSign Envelope ID: 269A6DB7-7944-42BC-BBEA-131DAD73AA51 LLNL-MI-2000182 PMO.DT-ST-02 (c) Reduce LLNS-provided potable water use through signage and shutting-off water sources at night to minimize leakage. (d) Turn off water source when not in use. (e) Use water efficient products in work activities, where feasible. 3.8 LEAD 3.8.1 Workers may encounter lead-contaminated materials when performing work on this project. Refer to Section 01 35 23.21 - Lead Work Exposure Protection and the Project Requirements Document for further information. 3.8.2 LLNS tracks the amount of lead processed and disposed as required by Federal Emergency Planning and Community Right-to-Know Act (EPCRA), section 313 reporting regulations. The Subcontractor is responsible for documenting the amount of lead (weight) handled and submitting to LLNS. 3.9 ASBESTOS 3.9.1 Workers may encounter asbestos-containing materials when performing work on this project. Refer to Section 01 35 23.13 - Asbestos Safety: Class I and II, Section 01 35 23.19 - Asbestos Safety - Class III and Unclassified, and the Project Requirements Document for further information. 3.10 IMPORTED FILL MATERIAL 3.10.1 If the project involves importing fill material, test the material to ensure it meets the LLNL Soil Reuse Criteria before being brought onto the project site. 3.10.2 Identify a borrow material source, and have the materials sampled and tested. Chemical analysis of collected samples must be in accordance with section 3.1 of LLNL's Soils Screening and Management Plan. 3.10.3 Coordinate import of fill materials through the STR. 3.10.4 Composite samples for volatile organic compounds (VOCs) are not acceptable. Composite samples for heavy metals, pesticides, herbicides, or polycyclic aromatic hydrocarbons (PAHs) from unanalyzed stockpiled soil are also unacceptable unless the material is stockpiled at the borrow area and originates from the same source area. Note: The individual or individuals that collect the samples must be trained (e.g., coursework or degree in Civil, Environmental, or Geotechnical Engineering, or Geology) to collect soil samples for environmental testing. 3.10.5 Analyze collected samples with a State of California Environmental Laboratory Accreditation Program (ELAP) certified laboratory. Guidelines for sampling of the proposed borrow material is outlined in the following table from the California Department of Toxic Substances Control (DTSC). Recommended Fill Material Sampling Schedule Area of Individual Borrow Area Sampling Requirements 2 acres or less Minimum of 4 samples 2 to 4 acres Minimum of 1 sample every 1/2 acre 4 to 10 acres Minimum of 8 samples Lawrence Livermore National Laboratory Environmental Protection LLNL Facilities Master Specification (rev. 8 June 2024) Section 01 35 43 - Page 14 UNCONTROLLED UNCLASSIFIED INFORMATION DocuSign Envelope ID: 269A6DB7-7944-42BC-BBEA-131DAD73AA51 LLNL-MI-2000182 PMO.DT-ST-02 Minimum of 8 locations with 4 subsamples per Greater than 10 acres location Volume of Borrow Area Stockpile Samples per Volume Up to 1,000 cubic yards 1 sample per 250 cubic yards 4 samples for the first 1,000 cubic yards, +1 1,000 to 5,000 cubic yards sample for each additional 500 cubic yards 12 samples for the first 5,000 cubic yards, +1 Greater than 5,000 cubic yards sample per each additional 1,000 cubic yards 3.11 DISPOSAL OF EXCESS SOIL, ASPHALT, CONCRETE, AND OTHER MATERIALS 3.11.1 If the project involves demolition, soil disturbance, or both, then LLNS may need to test materials for contamination prior to disturbance, disposal, or re-use (disposal and re-use of excavated or demolished materials, e.g., asphalt, soil, concrete, and other materials). Coordinate such sample testing with the STR. (a) Sampling and Evaluation (1) If LLNS has evaluated the materials and determines that off-site management is required, then the following must occur: (2) Send non-hazardous, municipal, and industrial waste to Altamont Landfill & Resource Recovery, Vasco Road Landfill, Tracy Material Recovery, or Forward Landfill (including asphalt and concrete for recycling). Recycle materials through LLNS preferred pathways as indicated in the attached Solid Waste Management Plan (SWMP). (3) Generated hazardous waste will be managed by LLNS. (4) Coordinate disposal of materials demonstrating visual/detectable contamination with the STR. (5) Immediately stop work and notify the ​STR​ if workers encounter unexpected, impacted soil and debris or suspect items (e.g., drums, boxes, cans, bottles, or discolored, malodorous, or otherwise suspected contaminated soil and debris) and wait for further direction regarding resumption of work. (6) If LLNS has not evaluated the materials to determine the proper disposition, LLNS will sample and evaluate materials resulting from excavating on the project site prior to the Subcontractor removing the materials from the site. (A) Stockpile such materials in separate piles or in roll-off bins as designated by LLNS. (B) Stake and identify each pile and separate piles by location. (C) Place the materials on and cover with plastic sheeting at LLNS-designated location and secure against displacement until such materials are tested and approved for disposal. 3.11.2 Solid Waste Management: LLNS encourages and tracks recycling and solid waste diversion for construction waste and municipal waste generated during the project, such as scrap metal. Lawrence Livermore National Laboratory Environmental Protection LLNL Facilities Master Specification (rev. 8 June 2024) Section 01 35 43 - Page 15 UNCONTROLLED UNCLASSIFIED INFORMATION DocuSign Envelope ID: 269A6DB7-7944-42BC-BBEA-131DAD73AA51 LLNL-MI-2000182 PMO.DT-ST-02 (a) The disposal or recycling options must be indicated in the project SWMP. For alternate disposal or recycling sites, submit the proposed site information, description, quantity of materials to be disposed or recycled, and relevant facility work authorization (i.e., permits, licenses, certifications, etc.) to LLNS for evaluation. Contact the STR for coordination. (b) Manage recyclable materials through LLNS unless LLNS makes a prior agreement for the Subcontractor to recover the recycled materials. (c) Use LLNS paper and cardboard recycling bins, where available, to reduce the amount of municipal waste generated. (d) If recovered by the Subcontractor, E-waste must be managed through a Department of Toxic

SDS Library

Move your SDS library online today

Check Icon
Setup – Easy setup with our database of 16 million+ SDSs
Check Icon
Up-to-date – Your SDS get updated to latest versions.
Check Icon
Employee access – Tablets, Smartphones, or link from Corporate Intranet
Check Icon
Safety – One-click access to first aid information.
Check Icon
Labels – Generate Secondary Container Labels with just one click.